SW2 SWITCHES 6–8: BAUD SETTINGS
Pelco’s
Switch Number | ||||
|
|
|
|
|
2400 | Baud (default for | Off | Off | Off |
|
|
|
|
|
4800 | Baud (default for | On | Off | Off |
|
|
|
|
|
9600 | Baud | Off | On | Off |
|
|
|
|
|
SW2 Switch 9: Coaxial/UTP Cable
SW2 Switch 10: Termination Setting
When connecting more than one Spectra IV/Spectra IV SE dome system to a single controller, terminate the unit farthest from the controller. Termination is only required for the last dome in the series.
The dome drive is shipped from the factory in the unterminated (OFF) position. To terminate the dome drive, set
Note: Dome termination is not required for Coaxitron® control.
DOME DRIVE INSTALLATION
Install the dome drive. Align the blue and red tabs with the blue and red arrows on the hinged door inside the back box. Push the tabs in. Insert one side and then the other side. Continue pushing on the ends of the tabs until both sides click into place (refer to Figure 2). To use your dome system, refer to Getting Started on page 19.
Figure 2. Dome Drive Installation
Note: When removing a dome drive that has been in use, caution should be taken to avoid direct contact with the top plate of the unit. This section of the unit will be warm to the touch when first removed from an operating unit.
9 |