CM9502 Setting
If a CM9502 matrix system is used with the dome drive, set
Vicon System
The Vicon protocol is not currently available.
SW2 SWITCHES 4-5 – SERIAL PORT SETTINGS
2 Wire Setting (RS-485)
4 Wire Setting (RS-422)
SW2 SWITCHES 6-8 – BAUD SETTINGS
Pelco’s
Switch Number | ||||
|
|
|
|
|
2400 | Baud (default for | Off | Off | Off |
|
|
|
|
|
4800 | Baud (default for | On | Off | Off |
|
|
|
|
|
9600 | Baud | Off | On | Off |
|
|
|
|
|
SW2 Switch 9 – Coax/UTP Cable
SW2 Switch 10 – Termination Setting
When connecting more than one Spectra IV/Spectra IV SE dome system to a single controller, terminate the unit farthest from the controller. Termination is only required for the last dome in the series.
The dome drive is shipped from the factory in the unterminated (OFF) position. To terminate the dome drive, set
NOTE: Dome termination is not required for Coaxitron® control.
8 | C3412M (9/06) |