Q-Logic 59021-05 manual Powering Down a Switch, cli admin $image list, cli admin $reset

Models: 59021-05

1 180
Download 180 pages 45.41 Kb
Page 62
Image 62
cli (admin) $>image list

4 – Installation

￿

Powering Down a Switch

10.Display the list of firmware image files on the switch to confirm that the file was loaded. Refer to the ”Image Command” on page B-13for more information.

cli (admin) $>image list

11.Unpack the firmware image file to install the new firmware in flash memory. cli (admin) $>image unpack filename

12.Reset the switch to activate the new firmware. This will close the Telnet session by default.

cli (admin) $>reset

4.4

Powering Down a Switch

Simply unplugging the switch from the power source does not allow the switch to complete executing tasks and could lead to flash memory corruption. For this reason, open a Telnet session and use the Shutdown command to initiate an orderly shut down, then power down the switch. Refer to the ”Shutdown Command” on page B-65.

4-20

59021-05 A

Page 62
Image 62
Q-Logic 59021-05 manual Powering Down a Switch, cli admin $image list, cli admin $reset