Copying scheduled data

If you would like to enter a new item on a different date that has the same or similar content to a previously scheduled item, you may save time by copying the previous entry onto the new date using the copy function and editing it later if required.

The copy function operates similarly to the edit mode, instead of pressing -1 to store the data, m -1 are pressed. After the data is copied onto the new date, it also remains on the previous date as it was originally entered.

For example, if the “ABC Project meeting” scheduled on February 20 is also to be held at the same time on March 6, you may copy it onto the new date as follows:

1. Recall the items scheduled for February 20 and enter the edit mode.

[SCHEDULE ] [=I -102 20 1992 1sctimuLE 1

piiFq I-Em-j

2.Change the date. m 03 06

03/06/1992

lO:OOAM- 2:OOPM

ABC Project4 meeting

E D I T

(You can also change the entire date by pressing mj -1 at this point and reentering the entire date.)

3.Copy the data. piiFq rmTm-j

FRI 3/ 6/'92

10 : OOAM- 2 : OOPM

ABC Project meeting

4 1

Page 38
Image 38
Sharp ZQ-2000, ZQ-2200, ZQ-2400 manual Copying scheduled data, ABC Project4 meeting, ABC Project meeting