SBN TANK TYPE COMMERCIAL GAS WATER HEATER

SERVICE HANDBOOK

SBN SEQUENCE OF OPERATION

Sequence

1.Thermistors (probes) call for heat.

2.Inducer fan starts and provides draft.

3.Hot surface igniter = 20 sec. warmup.

4.Main gas valve opens 4 sec. trial for ignition. (Maximum 5 trials.)

5.Main burner ignites and proves.

6.Thermistors reach the temperature setting.

7.Main burners “OFF”

-Auto restart after 60 min.

-20 sec blower “interpurge” between trials

Top View

Draft Proving (Pressure) Switch Table

 

 

Pressure Setting To

 

 

Close Switch (Inches

SBN Models

Part No.

W.C.)

366

194411-0

(-) 1.60 ± .10"

275

194411-1

(-) 2.00" ± .10"

310

194411-2

(-) 1,75" ± .10"

120, 199, 250,

194411-3

(-) 2.40" ± .10"

400

 

 

 

 

 

154, 180, 199

194411-4

(-) 2.60" ± .10"

 

 

 

©2003

18

Technical Training Department

Ashland City, Tennessee

Page 19
Image 19
State Industries STC-074 specifications Sequence, Top View