SBN TANK TYPE COMMERCIAL GAS WATER HEATER
SERVICE HANDBOOK
SBN SEQUENCE OF OPERATION
Sequence
1.Thermistors (probes) call for heat.
2.Inducer fan starts and provides draft.
3.Hot surface igniter = 20 sec. warmup.
4.Main gas valve opens 4 sec. trial for ignition. (Maximum 5 trials.)
5.Main burner ignites and proves.
6.Thermistors reach the temperature setting.
7.Main burners “OFF”
-Auto restart after 60 min.
-20 sec blower “interpurge” between trials
Top View
Draft Proving (Pressure) Switch Table
|
| Pressure Setting To |
|
| Close Switch (Inches |
SBN Models | Part No. | W.C.) |
366 | ||
275 | ||
310 | ||
120, 199, 250, | ||
400 |
|
|
|
|
|
154, 180, 199 | ||
|
|
|
©2003 | 18 | Technical Training Department |
Ashland City, Tennessee