Preparing for Use

TANDBERG CONTENT SERVER ADMINISTRATOR GUIDE

What’s in the Box?

 

Rack Mounting (optional)

 

 

 

To avoid damage to the unit during transportation, the Content Server is delivered in a special shipping box, which should contain the following components:

CD with User Guide and other documentation.

Rack-ears, screws and screwdriver.

Cables.

Power cable.

Ethernet cable.

TANDBERG Content Server.

Please report any discrepancies to your TANDBERG Representative immediately.

Installation Site Preparations

Make sure the Content Server is accessible and that all cables can be easily connected.

For ventilation: Leave a space of at least 10 cm (4 inches) behind the Content Server’s rear panel and 10 cm (4 inches) in front of the front panel.

The room in which you install the Content Server should have an ambient temperature between 0 ºC and 35 ºC (32 ºF and 95 ºF) and between 10 % and 90 % non-condensing relative humidity.

Do not place heavy objects directly on top of the Content Server.

Do not place hot objects directly on top, or directly beneath the Content Server.

Use a grounded AC power outlet for the Content Server.

Before starting the rack mounting please make sure the TANDBERG Content Server is placed securely on a hard flat surface.

Attach the brackets to the Content Server on both sides of the unit.

Connect a LAN cable from the LAN 1 connector

on the Content Server to your network.

The LAN 2, 3 and 4 connectors are

not used and should be left open.

Disconnect the AC power cable, if

 

Make sure that the mounting space is

applicable.

 

prepared according to the Installation Site

 

 

Preparations below left.

 

 

10 cm

 

 

10 cm

 

 

 

Insert the Content Server into a 19” rack, and secure with screws in the front (four screws).

Connecting Cables

Connect the AC power

cable to an electrical distribution

socket. Press the power switch button at the back side to 1 to turn on the Content Server.

On the front panel of the system the power indicator LED, marked Pwr, will light up.

Table of

 

Disclaimers,

 

Safety,

 

Introduction

Installation

Quick Setup

 

Operation

 

Backup and

 

Administrator

 

Conference

 

View

 

Appendices

Contents

 

Patents etc.

 

Environmental

 

 

 

Restoring

 

Settings

 

Setup

 

Conferences

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D13898.05

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

DECEMBER 2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 16
Image 16
TANDBERG S3 manual Preparing for Use, What’s in the Box? Rack Mounting optional, Installation Site Preparations