All installations and services must be performed by qualified service personnel.
h.The resistance of the take-off and the outlet register (or return grill) should then be summed together to determine the total pressure drop for each branch. This value should be close to the assumed value for the pressure drop of the system. If it is not close, then flowrates for each branch must be adjusted, or the design of the duct system must be altered, to give the proper pressure drops. Usually, the cross-sectional area of the ductwork should be changed in order to adjust the pressure drop to a suitable value.
Refer to Example 2, in Appendix B: Calculations of this manual, for a sample calculation of how to use this method for sizing the supply side ductwork for a residence.
Table 3 shows the air handling capacities of
21