OPERATION
Side and Rear Flail Operation Sec tio n 3- 9
© 2011 Alamo Group Inc.
OPERATION

5.2 Connecting the Side Flails to the Tractor

1. Install the Draft Beam onto the Main Frame.
2. Raise the Draft Beam to line up with the the ‘ears’ on the Side Flail and install Pins and hardware.
3. Connect the Linkage and Cylinder to the Side Flail for a Combo Lift set-up or route and connect the cable
to the Side Flail if it’s a Cable Lift set-up.
4. Route and connect the hydraulic lines to the cylinders and from the Brake Valve to the Side Flail motor.
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydr aul ic p ressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil le aks. If
you suspect a leak, REMOVE the HOSE and have i t tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure. (SG-15)
Avoid contact with hot surfaces including hydraulic oil tanks, pumps, motors, valves and
hose connections. Relieve hydraulic pressure before performing maintenance or repairs.
Use gloves and eye protection when servicing hot components. Contact with a hot surface
or fluid can cause ser io us inju ry from burns or scalding. (SG-34)
DO NOT allow any person under a side mower unless mower is
securely locked up or supported. DO NOT approach the Implement
unless the Tractor is turned off and all mot ion ha s cea sed. Never work
under the frame work, or any lifted component unless the implement is
securely supported or blocked up. A sudden or inadvertent fall by any
of these compon ents could cause serious injury or even death. (STI-03_A)