OPERATION

OPERATION

Always shut the Tractor completely down, place the transmission in park, and set the

parking brake before you or anyone else attempts to connect or disconnect the Implement and Tractor hitches. (S3PT-15)

5.1 Connecting the Rear Flail to the Tractor

1.Make sure the tractor is equipped with the correct PTO shaft. Change shafts if needed.

2.Shorten or remove the tractor drawbar to avoid interference when raising and lowering the mower.

3.Board the tractor and start the engine. Position the tractor to the mower with the 3-point lift arms positioned between the respective set of mower A-frame lift lugs. Note: Set the 3-point lift control to “Position Control” so that the lift arms maintain a constant height when attaching the mower. See the tractor Operator’s Manual for correct settings when attaching 3- point equipment.

4.Turn off the tractor engine and dismount.

5.One lift arm at a time, align arm end hole between the set of A-frame lift lugs. Insert hitch pin through the lug and arm holes and insert retaining pin into hitch pin.

6.Walk around to opposite side and repeat procedure for remaining lift arm and hitch pin.

7.Extend or retract 3-point top link to align its end hole with the holes of the mower’s top link. Insert the top link hitch pin and insert retaining pin into hitch pin.

Adjust any lower link check chains, guide blocks, or sway blocks to prevent the mower from swaying side to side and possible contact with tractor rear tires.

NOTE: Offset Adaptor Hitches are available to position the mower to the left or right. Mowers with Offset Adaptor hitches connect to the 3-Point hitch the same way as the mower A-frame.

Side and Rear Flail

Operation Section 3-8

© 2011 Alamo Group Inc.

Page 60
Image 60
Tiger Mowers JD 5065M, JD 5085M-105M manual Connecting the Rear Flail to the Tractor