Implement Relief Pressure Test

NOTE: See Sauer–Sundstrand IHT Service Manual for more information.

Use a 5,000 PSI (350 Bar) test gauge.

Specification:1,000 to 1,100 PSI (69 to 76 Bar)

1.Make sure hydraulic oil is at normal operating temper- ature by operating the machine for approximately 10 minutes.

2.Lower cutting unit, engage parking brake and stop the engine.

3.Install a 5,000 PSI (350 Bar) pressure gauge with quick connect adapter on the test port.

4.Start the engine and move the throttle control all the way forward. Pull back on the lift lever until the imple­ ment is fully raised. Continue holding the lift lever back to cause the relief valve to open, then read the gauge.

NOTE: Normal location for adjusting implement relief pressure is on the top of the IHT. If the machine is equipped with Model 30726 Hydraulic Kit, the original valve is permanently closed, and a new implement relief valve is installed in the hydraulic manifold. If the addi­ tional valve is present, adjust relief pressure at the new location only.

1

Figure 14

1. Test Port

1

Figure 15

1. Implement relief valve (standard)

1

Figure 16

1.Implement relief valve (Port R1) (Model 30726 Hydraulic Kit)

Hydraulic System

Page 5 – 14

Groundsmaster 3000/3000–D

Page 84
Image 84
Toro 3000D manual Implement Relief Pressure Test