Install Lift Arm Ball Joints

1.Adjust ball joint in each lift arm assembly until a di- mension of 2.75 inches (70 mm) from end of lift arm to center of ball joint is attained.

140 ft–lb (19 Kgm)

then continue tightening until slot in nut aligns with cotter pin hole

1

2.75 in. (70 mm)

2

 

 

84 inch Cutting Units

Figure 18

1. Ball Joint

2. Lift Arm

Drive Belt Replacement

The blade drive consists of three belts, one main drive belt and two wing belts. The main drive belt is tensioned by a fixed idler with a spring adjustment. The wing belts have spring loaded idlers. All belts are very durable but after many hours of use, the belt will show signs of wear. Signs of a worn belt are: squealing when belt is rotating, blades slipping when cutting grass, frayed edges, burn marks and cracks. Replace any belt if any of these conditions are evident. Adjust belt tension on main belt after first 5 hours of operation to assure maximum dura­ bility and thereafter, check tension every 50 hours.

1.Lower cutting unit to the shop floor. Remove belt covers from top of cutting unit and set covers aside.

2.Pull on spring loaded idlers and remove wing belts.

3.Loosen fixed idler pulley locking nut.

4.Loosen spring tensioning nut as required and re­ move belt.

5.Tighten spring tensioning nut until spring length is 4.35 inches (111 mm) inside spring loops.

6.Tighten idler pulley locking nut.

7.Pull on spring loaded idlers and install wing belts.

8.Install belt covers to top of cutting unit.

3

4.35 in. (111 mm)

1

2

Figure 19

1.Idler Pulley

2.Spring Tensioning Nut

3.Idler Pulley Locking Nut

Figure 20

Groundsmaster 3000/3000–D

Page 9 – 11 Rev. A

84 inch Cutting Units