Toshiba RAM-SM560BT-E, RAM-SM800KRT-E Correct Usage, Preparation, Requirement, Push, button

Models: RAM-SM560BT-E RAM-SM560KRT-E RAM-SM800UT-E RAM-SM800AT-E RAM-SM560UT-E RAM-SM800BT-E RAM-SM560AT-E RAM-SM800KRT-E

1 110
Download 110 pages 17.63 Kb
Page 23
Image 23

CORRECT USAGE

When you use the air conditioner for the first time or when you change the SET DATA value, follow the proce- dure below. From the next time, the operation displayed on the remote controller will start by pushing the button only.

Preparation

Turn on the main power switch and/or the leakage breaker.

• When the power supply is turned on, a partition line is displayed on the display part of the remote controller.

*After the power supply is turned on, the remote controller does not accept an operation for approx. 1 minute, but it is not a failure.

REQUIREMENT

While using the air conditioner, operate it only with button without turning off the main power switch and the leak breaker.

3

UNIT

SET CL

1 Push
button.

1

2

4

The operation lamp goes on, and the operation starts.

2 Select an operation mode with the “MODE” button.

One push of the button, and the display changes in the order shown on the right.

AUTO HEAT DRY COOL FAN

In HEAT mode, if the room temperature reaches to the set temperature, the outdoor unit stops and the air flow becomes LOW and the air volume decreases.

In the defrost mode, the fan stops so that cool air is not discharged and PRE-DEF is displayed.

3 Select air volume with “FAN ” button.

One push of the button, and the display changes in the order shown on the right.

AUTO HIGH MED. LOW

When air volume is “AUTO ”, air volume differs according to the room temperature.

In DRY mode, “AUTO ” is displayed and the air volume is LOW.

In heating operation, if the room temperature is not heated sufficiently with VOLUME “LOW ” opera- tion, select “MED. ” or “HIGH ” operation.

4 Determine the set up temperature by pushing the “TEMP. ” or “TEMP. ” button.

20

Page 23
Image 23
Toshiba RAM-SM560BT-E Correct Usage, Preparation, Requirement, Turn on the main power switch and/or the leakage breaker