Toshiba RAM-SM560UT-E Piping and Drain Hose Installation, In case of right-side exit

Models: RAM-SM560BT-E RAM-SM560KRT-E RAM-SM800UT-E RAM-SM800AT-E RAM-SM560UT-E RAM-SM800BT-E RAM-SM560AT-E RAM-SM800KRT-E

1 110
Download 110 pages 17.63 Kb
Page 99
Image 99

5 DRAIN PIPING WORK

Piping and Drain Hose Installation

In case of right-side exit

Cut out the knockout portion by the slits with a knife or pair of wire cutters as necessary.

Slit

(Body right)

In case of downward pipe exit

Cut out the knockout portion by the slits with a knife or pair of wire cutters as necessary.

Slit

(Body right)

Piping via left-hand connection

Bend the connecting pipe so that it is laid within 43mm above the wall surface. If the connecting pipe is laid exceeding 43mm above the wall surface, the indoor unit could be unstable when set on the wall. When bending the connecting pipes, always use a suitable bending tool to avoid damaging the pipes.

Bend the connection pipe within a radius of 30mm.

To connect the pipe after installation of unit (figure)

465mm

(To the front of the flare)

Liquid side

365mm

Gas side

Outward form of indoor unit

43mm

R 30mm

 

Use the handle of a screwdriver, etc.

NOTE :

If the pipe is bent incorrectly, the indoor unit could be unstable on the wall.

After passing the connecting pipe through the pipe hole, connect the connecting pipe to the auxiliary pipes and insulate as necessary.

96

Page 99
Image 99
Toshiba RAM-SM560UT-E Piping and Drain Hose Installation, In case of right-side exit, In case of downward pipe exit