Toshiba RAM-SM800UT-E Be sure to provide grounding, Required tools for installation work

Models: RAM-SM560BT-E RAM-SM560KRT-E RAM-SM800UT-E RAM-SM800AT-E RAM-SM560UT-E RAM-SM800BT-E RAM-SM560AT-E RAM-SM800KRT-E

1 110
Download 110 pages 17.63 Kb
Page 5
Image 5

RAV-SM800AT-E RAV-SM800AT-E

After unpacking the unit, examine it carefully if there are possible damage.

Do not install in a place that might increase the vibration of the unit.

To avoid personal injury (with sharp edges), be careful when handling parts.

Perform installation work properly according to the Installation Manual.

Inappropriate installation may result in water leakage, electric shock or fire.

When the air conditioner is installed in a small room, provide appropriate measures to ensure that the concentration of refrigerant leakage occur in the room does not exceed the critical level.

Install the air conditioner securely in a location where the base can sustain the weight adequately.

Perform the specified installation work to guard against an earthquake.

If the air conditioner is not installed appropriately, accidents may occur due to the falling unit.

If refrigerant gas has leaked during the installation work, ventilate the room immediately.

If the leaked refrigerant gas comes in contact with fire, noxious gas may generate.

After the installation work, confirm that refrigerant gas does not leak.

If refrigerant gas leaks into the room and flows near a fire source, such as a cooking range, noxious gas might generate.

Electrical work must be performed by a qualified electrician in accordance with the Installa- tion Manual. Make sure the air conditioner uses an exclusive power supply.

An insufficient power supply capacity or inappropriate installation may cause fire.

Use the specified cables for wiring connect the terminals securely fix. To prevent external forces applied to the terminals from affecting the terminals.

Be sure to provide grounding.

Do not connect ground wires to gas pipes, water pipes, lightning rods or ground wires for telephone cables.

Conform to the regulations of the local electric company when wiring the power supply.

Inappropriate grounding may cause electric shock.

Do not install the air conditioner in a location subject to a risk of exposure to a combustible gas.

If a combustible gas leaks, and stays around the unit, a fire may occur.

Required tools for installation work

R410A (Special requirement)

1)Philips screw driver

2)Hole core drill (65 mm)

3)Spanner

4)Pipe cutter

5)Knife

6)Reamer

7)Gas leak detector

8)Tape measure

9)Thermometer

10)Mega-tester

11)Electro circuit tester

12)Hexagonal wrench

13)Flare tool

14)Pipe bender

15)Level vial

16)Metal saw

17)Gauge manifold

(Charge hose : R410A special requirement)

18)Vacuum pump

(Charge hose : R410A special requirement)

19)Torque wrench

1/4 (17 mm) 16 N•m (1.6 kgf•m) 3/8 (22 mm) 42 N•m (4.2 kgf•m) 1/2 (26 mm) 55 N•m (5.5 kgf•m)

5/8 (15.9 mm) 120 N•m (12.0 kgf•m)

20)Copper pipe gauge adjusting projection margin

21)Vacuum pump adapter

2

Page 5
Image 5
Toshiba RAM-SM800UT-E Be sure to provide grounding, Required tools for installation work, R410A Special requirement