FILE NO. SVM-10020

No. Part name

Procedure

Remarks

Side cabinet 1. Side cabinet (right)

1)Perform step 1 in and all the steps in

ƒ.

2)Remove the fixing screw used to secure the side cabinet and heat exchanger.

3)Remove the fixing screw (screw 2 pcs.) used to secure the plate conduit and

 

side cabinet.

 

4) Remove the fixing screw (screw 3 pcs.)

 

 

used to secure the side cabinet to the

 

 

bottom plate and valve fixing panel.

A

2. Side cabinet (left)

 

1)

Perform step 1 in .

 

2)

Remove the fixing screw used to secure

 

 

the side cabinet (left) onto the heat

 

 

exchanger.

 

3)

Remove the fixing screw (screw 2 pcs.)

 

 

used for securing the side cabinet to the

 

 

bottom plate and heat exchanger.

B

 

 

 

 

C

 

Detail A

Detail B

Detail C

 

 

 

Fan motor

1) Perform work of item 1 of and .

 

2)Remove the flange nut fixing the fan motor and the propeller.

• Flange nut is loosened by turning clock-

Propeller fan

 

 

 

Fan motor

wise. (To tighten the flange nut, turn

 

 

 

counterclockwise.)

 

 

3)Remove the propeller fan.

4)Disconnect the connector for fan motor from the inverter.

5)Remove the fixing screws (4 pcs.) holding by hands so that the fan motor does not fall.

* Precautions when assembling the fan

 

Flange nut

motor

 

 

Tighten the flange nut using a tightening

 

torque of 3.3 lbf.ft (4.5 Nm).

 

– 102 –