|
|
|
| FILE NO. |
|
|
|
|
|
No. | Part name |
| Procedure | Remarks |
|
|
|
| |
‰ | Electronic | 1. Detachment |
| |
| expansion valve | 1) | Perform step 1 in ‚, all the steps in ƒ |
|
| coil |
| ||
|
| and 1 in …. |
| |
|
|
|
| |
|
| 2) | Remove the coil by pull it upward. |
|
2.Attachment
1)Insert a valve coil to value body by push it downward. And confirm to fix it surely.
Š Wire guard | 1. Detachment | |
| 1) | Perform work of item 1 of ‚. |
| 2) | Remove the front cabinet, and put it down |
|
| so that wire guard side directs downward. |
Perform work on a corrugated cardboard, cloth, etc. to prevent flaw to the product.
3)Remove the guard stopper (4 pcs.) from hook of wire guard.
4)Turn the front cabinet into opposite site then
pull wire guard up ward.
2.Attachment
1)Insert claws (2 positions) of the wire guard in the holes of the front cabinet. Push the hook (4 positions) by hands and fix by guard stopper.
Check that all the claws & hooks are fixed to the specified positions.
– 104 –