U-Line CLRCO2175 Service and Repair, 3-63, Figure, Standpipe P60 Pump Required, Y-BranchTailpiece

Models: 2175R 2115R 2115WC 2175/2275DWRR 2115WCOL 2175BEV 2175WC 2175RF CLR2160 CO2175/CO2275DWR CO2175F CLRCO2175 2275DWRWOL 2175WCOL 2275DWRWS

1 180
Download 180 pages 38.87 Kb
Page 78
Image 78
Standpipe

Section 3 - Service and Repair

10. Once pushed completely into the opening finish routing the drain

tubing to the desired location. Common installations use a floor

drain, standpipe, garbage disposal, or Y-branch tailpiece-type drain

connection (Figure 73 - 76). After the installation is complete,

Standpipe

P60 Pump Required

check the unit to ensure it is level both side to side and front to

back. For disposal connections an optional adapter may be

required (included with the kit) to adapt from the 7/8" connection.

11. For the gravity/floor drain or the standpipe drains it is important to

secure the drain tubing to those items to prevent it from coming

loose. For the disposal or

Y-branch tailpiece connections press the drain tube over the

barbed end on the connector. Make sure the knockout inside the

tailpiece has been removed for both types of connections. Attach

these two with a worm drive hose clamp. Depending on the size of

the

Air gap must be left between drain line and water level. Y-Branch Tailpiece

P60 Pump RequiredDisposalP60 PumpRequired Waste

Shut-Off

Valve

Floor Drain3-63Manual backgroundManual backgroundManual backgroundCold

Manual backgroundManual backgroundManual background Hot Water

Water

Y-branch or disposer fitting an adapter may be needed to interface

between the 5/8" hose and connection.

12. After all connections have been completed turn the unit to the ON

position. Pour one gallon of water into the ice bin and check all drain

connections for leaks. During this time also ensure that the water

flows from the bin. If the water does not flow from the bin there

may be a problem with the drain connection such as kinks or

improper slope. If your unit has a drain pump an indicator of P1 on

the display will alert to a slow or clogged drain. If any problems are

found, retrace the drain connection, correct the issue and retest

with water.

Y-Branch Tailpiece

 

P60 Pump Required

 

Air Gap

 

(Optional Hook-Up)

 

 

Waste

 

Shut-Off

 

Valve

 

Cold

Hot

Water

Water

 

ULIN_0600a_A

Figure 73

WasteULIN_0598a_A

Figure 74

Disposal

 

 

P60 Pump

Air Gap

 

Required

(Optional Hook-Up)

 

 

 

Waste

 

 

Cold

 

Hot

Water

 

Water

 

 

 

Shut-Off

 

 

Valve

 

ULIN_0599a_A

Figure 75

Floor Drain

 

 

Air gap must

 

 

be left between

 

Waste

drain line and

 

Shut-Off

water level.

 

 

Valve

 

 

 

 

Cold

 

Hot

Water

 

Water

 

Waste

ULIN_0597a_A

Figure 76

3-63

Page 78
Image 78
U-Line CLRCO2175 Service and Repair, 3-63, Figure, Standpipe P60 Pump Required, Y-BranchTailpiece, Disposal, Floor Drain