Woods Equipment DS96, DS120 manual Crossbar Installation, Crossbar Timing

Models: DS120 DS96

1 78
Download 78 pages 4.35 Kb
Page 34
Image 34

CROSSBAR INSTALLATION

1.Using emery cloth (220 or finer), remove surface rust, and foreign material from hub, splined gearbox vertical shaft, and crossbar. See Figure 24.

Figure 24. Example of Crossbar and Gearbox Shaft

2.Install crossbar (8), Figure 22, on splined shaft. Install castle nut (37) and cotter pin (38). Torque nut to 450 lbs-ft.

3.Install blades, reinstall them using existing hardware. Torque cap screws to 85 lbs-ft.

CROSSBAR TIMING

Crossbar must be re-timed anytime a crossbar or a side drive is disconnected.

1.To re-time crossbars, position bars as shown in Figure 25.

2.The right crossbar will be at right angles to the front of the cutter.

3.Measure from the front of the cutter to the blade pin on each side crossbar.

4.Hold crossbars in position while connecting the side drivelines.

Figure 25. Crossbar Timing - Bottom View

34 Dealer Service

MAN0390 (Rev. 4/6/2007)

 

 

Page 34
Image 34
Woods Equipment DS96, DS120 manual Crossbar Installation, Crossbar Timing