Woods Equipment DS120, DS96 manual Dealer Service, Universal Joint Repair, U-Joint Disassembly

Models: DS120 DS96

1 78
Download 78 pages 4.35 Kb
Page 35
Image 35
UNIVERSAL JOINT REPAIR

UNIVERSAL JOINT REPAIR

1.Yoke

2.Cup and bearing

3.Snap ring

4.Journal cross

Figure 26. Universal Joint Parts Breakdown

U-JOINT DISASSEMBLY

1.Remove external snap rings from yokes in four locations as shown in Figure 27.

Figure 27. Remove Snap Ring

2.With snap rings removed, support drive in vise, hold yoke in hand and tap on yoke to drive cup up out of yoke. See Figure 28.

3.Clamp cup in vise as shown in Figure 29 and tap on yoke to completely remove cup from yoke. Repeat Step 2 and Step 3 for opposite cup.

Figure 29. Remove Cups

4.Place universal cross in vise as shown in Figure 30 and tap on yoke to remove cup. Repeat Step 3 for final removal. Drive remaining cup out with a drift and hammer.

Figure 30. Remove Cups

 

U-JOINT ASSEMBLY

 

1. Place seals securely on bearing cups. Insert cup

 

into yoke from outside and press in with hand

 

pressure as far as possible. Insert journal cross

 

into bearing cup with grease fitting away from

 

shaft. Be careful not to disturb needle bearings.

 

Insert another bearing cup directly across from first

 

cup and press in as far as possible with hand

 

pressure.

 

2. Trap cups in vise and apply pressure. Be sure

 

journal cross is started into bearings and continue

 

pressure with vise, squeezing in as far as possible.

Figure 28. Remove Cups

Tapping the yoke will help.

(Rev. 5/11/2007) MAN0390 (Rev. 4/6/2007)

Dealer Service 35

Page 35
Image 35
Woods Equipment DS120, DS96 manual Dealer Service, Universal Joint Repair, U-Joint Disassembly, U-Joint Assembly