Briggs & Stratton 30000 SERIES system manual Installation

Page 7

Installation

Equipment Description

This product is intended for use as an optional home generator system which provides an alternate source of electric power and to serve loads such as heating, refrigeration systems, and communication systems that, when stopped during any power outage, could cause discomfort or inconvenience. This product does not qualify for emergency standby as defined by NFPA 70 (NEC).

Customer Responsibilities

Read and follow the instructions given in the Operator’s Manual, especially the section regarding selecting essential circuits.

Follow a regular schedule in maintaining, caring for and using your home generator, as specified in the Operator’s Manual.

Installer Responsibilities

Read and observe the safety rules.

Install only an UL approved transfer switches that is compatible with the home generator.

Read and follow the instructions given in this Installation and Start-up Manual.

IMPORTANT: The system is equipped with a water heater that is activated when ambient temperature is less than 80°F AND utility power is present at the transfer switch.

Unpacking Precautions

The unit is shipped ready for installation on a prepared reinforced cement slab or engineered base. Avoid damage from dropping, bumping, collision, etc. Store and unpack carton with the proper side up, as noted on the shipping carton.

Delivery Inspection

After removing the carton, carefully inspect the home generator for any damage that may have occurred during shipment.

IMPORTANT: If loss or damage is noted at time of delivery, have the person(s) making delivery note all damage on the freight bill and affix his signature under the consignor’s memo of loss or damage. If loss or damage is noted after delivery, separate the damaged materials and contact the carrier for claim procedures. Missing or damaged parts are not warranted.

Shipment Contents

The home generator system is supplied with:

Home generator

Fully-serviced coolant system

Fully-serviced oil/lubricating system

UL569/CSA8.3-listed flexible fuel hook-up

Installation and start-up manual

Operator’s manual

Engine operator’s manual

Installation checklist

Two access door keys

One spare 15A fuse

10 Pole control panel connector

Remote LED indicator kit (red LED/plate/screws)

Not Supplied:

650 CCA starting battery (NOT deep-cycle)

Connecting wire and conduit

Fuel supply valves/plumbing

Required Specialty Tools/Equipment

Two 60” lengths of 2” Schedule 40 pipe (NOT conduit)

Lifting straps, chains or cables

Hole punches for 7 ga steel

Torque screwdriver, 5 to 50 inch-pound range

Ignition Timing Light

Air Fuel Ratio Meter (O2 Sensor and Analyzer)

Image 7
Contents Series Liquid-Cooled Home Generator System Model Number Model Revision Serial Number Where to Find UsDate of Purchase Generator EngineTable of Contents Hazard Symbols and Meanings Safety RulesBRIGGSandSTRATTON.COM Page Never operate generator without protective housing or covers Installation Generator Location Home Generator LocationGeneral Location Guidelines Female NPT Electrical and Fuel Inlet LocationsLifting the Generator Concrete SlabGaseous Fuel System Access DoorsTo Open an Access Door To Close an Access DoorNo leakage is permitted Natural Gas LP Vapor Fuel ConsumptionLP Vapor Natural Pole Connector Plug System Connectors+12 Volt DC, .5 Amp Output Internal auxiliary power supply Grounding the Generator Fault Detection SystemTo install the remote LED indicator Generator AC Connection SystemSystem Control Panel Final Installation ConsiderationsFuel Conversion BatteryFuel Supply System Initial Start-up No LoadVoltage Phi Lamda Schematic/ Wiring Diagram Operation Setting Exercise TimerInstallation Inspection ControlsBRIGGSandSTRATTON.COM Manual de Instalación y Arranque Número de Modelo Revisión Número de Serie Dónde encontrarnosFecha de compra Generador MotorMandos Utilización Instrucciones importantes de seguridad InstalaciónSímbolos de Peligro y Significados Conserve estas instruccionesAte para arriba el pelo largo y quite la joyería Tensión peligrosaNo modifique al generador en ninguna forma PrecauciónInstalación Ubicación del Generador Ubicación del Sistema de Generador de DomésticoPautas Generales para la Ubicación del Generador Ubicación de las entradas eléctricas y de combustible Solera de concretoElevación del Generador Para abrir una puerta de acceso Puertas de AccesoPara cerrar una puerta de acceso No encienda un cigarrillo o fume Sistema de combustible gaseosoVapor de Gas Dimensiones de la Cañería de CombustibleConsumo de Combustible Gas Natural Vapor de PLCableado para toma de 10 polos Conexiones de SistemaSistema de Detección de Fallas Sistema de Conexión de c.a. del GeneradorConexión a Tierra del Generador Interconexiones del Circuito de ControlConsideraciones finales para la instalación Panel de Control del SistemaNota no utilice una batería de ciclo profundo Sistema de Suministro de CombustibleArranque inicial sin carga BateríaTensión Phi Lamda Conversión de combustibleUtilización MandosSecuencia de operación automática Inspección posterior a la instalación Configuración del temporizador de prácticaTemporizador de enfriamiento del motor BRIGGSandSTRATTON.COM Manuel d’Installation et Démarrage Numéro de modèle Révision Numéro de série Où nous trouverDate d’achat Génératrice MoteurCommandes Fonctionnement Directives de sécurité importantes InstallationDirectives de sécurité importantes Symboles de Danger et MoyensSécurité Tension dangereuse Avis Précautions Lors du Déballage Responsabilités de l’InstallateurDescription de l’équipement Responsabilités de l’AcheteurDégagement Autour de la Génératrice Emplacement du Génératrice d’état d’AttenteDirectives Générales Concernant l’Emplacement Installez l’unité à l’extérieur SeulementSoulèvement de la Génératrice Dalle de bétonPour fermer une porte d’accès Instalación CommandesPortes d’Accès Pour ouvrir une porte d’accèsAucune fuite ne peut être tolérée Le système de combustible gazeuxGrosseur du Tuyau de Combustible Consommation de CombustibleGas Naturel Vapeur PL Propane GazEntretien Dépannage Garantie Connexions de systèmeSystème de Détection des Pannes Interconnexions du Circuit de CommandeSécurité Instalación Commandes Mise à la Masse de la GénératriceFusible de 15 Ampères Tableau de Commande du SystèmeConsidérations pour l’installation finale Huile à Moteur Interrupteur de systèmeDémarrage initial sans charge Système de refroidissementBatterie Système d’Alimentation en CombustibleLamda Conversion du combustibleTension Tout en observant l’afficheur de l’analyseur d’oxygèneSéquence de fonctionnement automatique CommandesCapteur de Prise en Charge de la Tension de Service FonctionnementRéglage de la minuterie de cycle d’exercice Vérification installationThis page reserved