Concrete Slab
At the appropriate location, construct a concrete slab (28 day compression strength of 3000 psi (200 MPa)) minimum
5 inches thick and 6 inches wider than the enclosure on all sides. Strengthen slab with No. 6 reinforcing bars (on 12” centers) or 8 ga. steel wire fabric (6” centers). Avoid placing reinforcement in entrance
| 49” |
|
10.5” | 7” | 7.38” |
| 34.25” |
|
14.25” |
| 8” |
|
| |
| Anchor bolt |
|
9.5” | position |
|
| (4 places) |
|
|
| 78” |
38” | Power Cable |
|
|
| |
| location |
|
Fuel Inlet |
| 94” |
Port |
|
|
Enclosure |
|
|
Base |
|
|
Exhaust |
|
|
Opening |
|
|
(shown for |
|
|
reference) | Slab Top VIew |
|
|
|
Attach unit to slab with 5/16” diameter (minimum) masonry anchor bolts long enough to retain the unit.
Electrical and Fuel Inlet Locations
A
A
B
1” Female NPT
Lifting the Generator
The generator weighs more than 1,700 pounds. Proper tools, equipment and qualified personnel should be used in all phases of handling and moving the generator.
warning
Hazardous Voltage
Contact with power lines can cause electric shock or burn.
Lifting Hazard / Heavy Object
Can cause muscle strain or back injury.
•DO NOT contact any power lines when using required lifting/hoisting equipment.
•DO NOT lift or move generator without assistance.
•Use lifting pipes or straps as described in Lifting the Generator. The unit may shift during movement, which can cause injury.
•DO NOT lift unit by roof as damage to generator will occur.
A
B
Two 60” lengths of 2” Schedule 40 pipe (B), supplied by the installer, are required to lift the generator onto cement pad. Insert pipes through the lifting holes (A) located near the unit’s base.
Use a spreader bar to ensure that the chains, straps or cables DO NOT touch the generator’s roof.