Emerson user manual Liebert FPC

Page 23

Installation Instructions

Figure 13 Typical Liebert FPC equipment arrangement

Liebert FPC

Ground electrode conductor (not by Liebert) required per NEC for units with transformer

Remote Emergency Power Off Switch (REPO)

Main input power to unit (not by Liebert)

ƒ3-phase, 3-wire plus ground for units with transformer

ƒ3-phase, 4-wire plus ground for units without transformer

*Transient suppression plate

 

Low voltage junction

Building interface and

 

 

alarm connections

 

box and cable

(not by Liebert)

* Flexible distribution cables

 

per customer specifications

 

* Optional devices : Refer to the

Main input junction box and cable specification sheet for options supplied

19

Image 23
Contents Liebert FPC Page Table of Contents Figures Important Safety Instructions Handling Considerations Unpacking and InstallationUnpacking and Preliminary Inspection Inch cabinet weight Front Footprint and Floor cable accessCutout Dimensions cooling airflow FrontLocation Considerations Unit PreparationFull Load Heat Output Unit kVA BTU/Hr kW See Notes 2 Front and rear access is required. See Notes 1Liebert FPC heat output Floor pedestal details Floor Pedestal InstallationLiebert FDC Distribution Mounting Additional Distribution Mounting & WiringPower and Control Wiring Input Power ConnectionsElectrical connection location for 23 584mm cabinet FPC15000 Rev FPC15002 Rev Suggested minimum input wire size data Main input circuit breaker interrupting rating Main input power junction box dimensions, typical Junction Box InstallationMain input junction box electrical connections 4 wire Low-voltage control junction box dimensions, typicalEquipment Grounding System GroundingOutput Voltage Signal Reference GridGrounding Electrode Conductor for FPCs With Transformer Minimum grounding electrode conductor size AWGSystemTypical Liebert FPC without transformer grounding Typical Liebert FPC With transformer grounding arrangementOutput Power Connections Liebert FPC Main Liebert FPC+24VDC Unit EPOFactory WiringLow Voltage Terminal Strip Optional Customer Alarm Inputs Summary Typical control wiring for units with monitoringStartup ChecklistsWarranty Internal InspectionTerminal block compression lug torque specifications Torque specifications, generalPanelboard main circuit breaker torque specifications Branch circuit breaker torque specificationsUnit Serial Number Unit Model Number Date InspectionStartup Monitoring System Check-Out Customer Alarms Manual Restart Startup ProceduresNormal System Shutdown Normal System Turn onFPC16000 Power Monitor PanelAlarm Present/Silence Basic Monitor Panel Units Without MonitoringOperating Instructions Parameter Default Ascii interface default parametersRS-232 Ascii port customer commands Field # Data item Units Monitored parameters data definitionsInspection Schedule Inspection and CleaningRepair Page That Ne tIti Ti n