Emerson FPC user manual Inspection, Unit Serial Number Unit Model Number Date

Page 29

Inspection and Startup Checklist

3.0INSPECTION AND STARTUP CHECKLIST

Unit Serial Number

Unit Model Number

Date

3.1 Inspection

! WARNING

All equipment inspection procedures are to be performed with power to the unit turned off and locked out.

___ 1. Confirm that the exterior of unit is undamaged (including cables and receptacles, if furnished).

___ 2. Confirm that service and ventilation clearances are adequate. (See Figures 1 through 3.)

___ 3. Remove accessible exterior and internal panels.

___ 4. Inspect all wire and conductor insulation for damage.

___ 5. Check all transformer terminal connections for tightness. Retorque if necessary.

___ 6. Check all breaker connections for tightness. Retorque if necessary.

___ 7. Check all terminal block connections for tightness. Retorque if necessary.

___ 8. Check transformer mounting bolts for tightness. Retorque if necessary.

___ 9. Remove any foreign objects from the components or the interior area of the unit. Make sure air passages on transformers are clear and free of debris.

___ 10. Check that the intake and exhaust air screens are clean and free of obstructions.

___ 11. Replace internal and exterior side panels, leaving access to circuit breakers for the following start-up procedure.

25

Image 29
Contents Liebert FPC Page Table of Contents Figures Important Safety Instructions Handling Considerations Unpacking and InstallationUnpacking and Preliminary Inspection Inch cabinet weight Cutout Dimensions cooling airflow Footprint and Floor cable accessFront FrontLocation Considerations Unit PreparationFull Load Heat Output Unit kVA BTU/Hr kW See Notes 2 Front and rear access is required. See Notes 1Liebert FPC heat output Floor pedestal details Floor Pedestal InstallationPower and Control Wiring Additional Distribution Mounting & WiringInput Power Connections Liebert FDC Distribution MountingElectrical connection location for 23 584mm cabinet FPC15000 Rev FPC15002 Rev Suggested minimum input wire size data Main input circuit breaker interrupting rating Main input junction box electrical connections 4 wire Junction Box InstallationLow-voltage control junction box dimensions, typical Main input power junction box dimensions, typicalEquipment Grounding System GroundingGrounding Electrode Conductor for FPCs With Transformer Signal Reference GridMinimum grounding electrode conductor size AWG Output VoltageSystemTypical Liebert FPC without transformer grounding Typical Liebert FPC With transformer grounding arrangementOutput Power Connections Liebert FPC +24VDC Liebert FPCUnit EPO MainFactory WiringLow Voltage Terminal Strip Optional Customer Alarm Inputs Summary Typical control wiring for units with monitoringWarranty ChecklistsInternal Inspection StartupPanelboard main circuit breaker torque specifications Torque specifications, generalBranch circuit breaker torque specifications Terminal block compression lug torque specificationsUnit Serial Number Unit Model Number Date InspectionStartup Monitoring System Check-Out Customer Alarms Normal System Shutdown Startup ProceduresNormal System Turn on Manual RestartAlarm Present/Silence Power Monitor PanelBasic Monitor Panel Units Without Monitoring FPC16000Operating Instructions Parameter Default Ascii interface default parametersRS-232 Ascii port customer commands Field # Data item Units Monitored parameters data definitionsInspection Schedule Inspection and CleaningRepair Page Iti Ne tTi n That