Inspection and Startup Checklist
Customer Alarms
If customer alarms are provided:
___ 1. With the FPC ON, simulate alarm operation by jumpering the appropriate
___ 2. Verify correct alarm annunciation by the Power Monitor Panel and/or by the Centralized Monitoring System.
3.4Equipment Connection
!
___ 1.
___ 2.
CAUTION
All loads should be disconnected or turned off before proceeding with the following steps.
For units with output distribution cables, be sure that NO output receptacles are connected to load equipment plugs and that the receptacles are not in contact with foreign objects.
Pay special attention to those output cables intended for direct wiring connection; the exposed conductor ends of these cables must not be in contact with each other or with any foreign objects.
Turn on main input power to the unit, then turn on the panelboard main output breaker(s).
Individually turn on each branch circuit breaker and check the output voltage (also phase rotation, if a
___ 3. Turn OFF all branch circuit breakers and the panelboard main output circuit breaker(s).
___ 4. Connect the load equipment per equipment manufacturer’s specifications and recommendations.
___ 5. Turn on the panelboard main output breaker(s).
___ 6. Turn on branch circuit breakers to the load equipment.
!
___ 7.
___ 8.
CAUTION
Observe the
Verify that all load equipment operates properly.
Replace all unit panels. After performing the inspection and
3.0- Inspection and Startup Checklist in this manual, complete the