Equipment Inspection and Startup

2.0EQUIPMENT INSPECTION AND STARTUP

2.1Internal Inspection

A detailed internal inspection should be performed after the unit is in place and before it is ener- gized, to ensure trouble free startup. The same internal inspection should be carried out when per- forming preventive maintenance.

! WARNING

Verify that all incoming line voltage (power) and low-voltage (control) circuits are de-energized and locked out before performing the internal inspection.

Open the unit - Gain access to the internal components of the Liebert FPC unit by removing the exterior panels and internal accent panels.

Visually inspect - Be sure wiring and components are not damaged.

Check power connections - Check all power connections for tightness. Refer to Tables 11 through 14 for torque requirements of all electrical connections.

Perform formal detailed inspection - Follow the procedures described in 3.0 - Inspection and Start-Up Checklist when performing detailed inspection.

2.2Startup

Checklists

Follow the detailed step-by-step checklist (3.0 - Inspection and Startup Checklist) when installing and starting up the Liebert FPC.

Initial System Startup

A qualified electrician must be employed to perform the equipment inspection and startup. Liebert system startup may be arranged by calling your local Liebert sales representative or Liebert Global Services. In the United States, call 1-800-LIEBERT.

Warranty

A copy of the appropriate checklist (furnished with the equipment) must be completed, signed, dated and returned to Liebert Corporation. Warranty coverage of the equipment is not effective unless the checklist has been received by the factory.

! WARNING

Equipment inspection and startup should be performed only by trained personnel. Hazardous voltages are present during startup procedures.

Electrical safety precautions must be followed throughout inspection and startup.

23

Image 27
Contents Liebert FPC Page Table of Contents Figures Important Safety Instructions Unpacking and Installation Unpacking and Preliminary InspectionHandling Considerations Inch cabinet weight Front Footprint and Floor cable accessCutout Dimensions cooling airflow FrontLocation Considerations Unit PreparationSee Notes 2 Front and rear access is required. See Notes 1 Liebert FPC heat outputFull Load Heat Output Unit kVA BTU/Hr kW Floor pedestal details Floor Pedestal InstallationLiebert FDC Distribution Mounting Additional Distribution Mounting & WiringPower and Control Wiring Input Power ConnectionsElectrical connection location for 23 584mm cabinet FPC15000 Rev FPC15002 Rev Suggested minimum input wire size data Main input circuit breaker interrupting rating Main input power junction box dimensions, typical Junction Box InstallationMain input junction box electrical connections 4 wire Low-voltage control junction box dimensions, typicalEquipment Grounding System GroundingOutput Voltage Signal Reference GridGrounding Electrode Conductor for FPCs With Transformer Minimum grounding electrode conductor size AWGSystemTypical Liebert FPC without transformer grounding Typical Liebert FPC With transformer grounding arrangementOutput Power Connections Liebert FPC Main Liebert FPC+24VDC Unit EPOWiring Low Voltage Terminal StripFactory Optional Customer Alarm Inputs Summary Typical control wiring for units with monitoringStartup ChecklistsWarranty Internal InspectionTerminal block compression lug torque specifications Torque specifications, generalPanelboard main circuit breaker torque specifications Branch circuit breaker torque specificationsUnit Serial Number Unit Model Number Date InspectionStartup Monitoring System Check-Out Customer Alarms Manual Restart Startup ProceduresNormal System Shutdown Normal System Turn onFPC16000 Power Monitor PanelAlarm Present/Silence Basic Monitor Panel Units Without MonitoringOperating Instructions Ascii interface default parameters RS-232 Ascii port customer commandsParameter Default Field # Data item Units Monitored parameters data definitionsInspection and Cleaning RepairInspection Schedule Page That Ne tIti Ti n