Emerson FPC Startup Procedures, Normal System Shutdown, Normal System Turn on, Manual Restart

Page 33

Operating Instructions

4.0OPERATING INSTRUCTIONS

4.1Startup Procedures

Before the unit is placed into service after initial installation, after equipment relocation, or after equipment has been de-energized for an extended period of time, perform equipment inspection and start-up procedures as detailed in 2.0 - Equipment Inspection and Startup and 3.0 - Inspection and Startup Checklist.

After initial system startup, the following guidelines can be used for standard equipment operation. These guidelines should be reviewed for any special equipment modifications, special site consider- ations or company policies that may require changes to the standard equipment operation.

4.1.1Emergency Shutdown—If Emergency Power Off switch is supplied

To perform an immediate system shutdown during emergency conditions, lift the clear protective cover and push the Emergency Power Off (EPO) switch on the FPC’s monitoring panel.

NOTE

Depending on the particular control circuit wiring, operation of the unit EPO switch may cause other equipment to also shutdown.

If the site is equipped with a Remote Emergency Power Off (REPO) switch to perform an immediate room shutdown, actuate one of the REPO switches. NEC Article 645 requires a REPO switch at the principal exit doors.

4.1.2Normal System Shutdown

To perform a normal system shutdown, perform an orderly load equipment shutdown according to the load equipment manufacturer’s recommended shutdown sequence. The load equipment can be turned OFF at each piece of load equipment or at the FPC’s output distribution (circuit breaker) panels located behind the FPC’s front door. Turn OFF all unit output breakers, then turn OFF the unit’s main input circuit breaker. To remove all power from the FPC, turn OFF the building power to the FPC’s input breaker or junction box.

4.1.3Normal System Turn ON

Make certain all of the FPC’s circuit breakers are in the OFF position. All unit circuit breakers are located behind the front doors. Turn ON building power to the FPC. Turn ON the FPC’s main input circuit breaker. If the circuit breaker has been tripped OFF (instead of being turned OFF), the circuit breaker handle must be moved to the OFF position before being turned ON. If the FPC has a voltage monitoring panel, verify proper output voltages before turning ON output circuit breakers. Turn ON the panelboard main breakers. Individually turn ON each output circuit breaker following the load equipment manufacturer’s startup sequence.

4.1.4Manual Restart

If the FPC’s manual restart feature has been selected, the unit’s main input circuit breaker will be tripped upon a power failure, preventing repetitive application of unstable voltage and allowing for an orderly system restart. If the main input circuit breaker is tripped upon a power failure, wait until power is restored, then follow the instructions in 4.1.3 - Normal System Turn ON.

29

Image 33
Contents Liebert FPC Page Table of Contents Figures Important Safety Instructions Unpacking and Installation Unpacking and Preliminary InspectionHandling Considerations Inch cabinet weight Cutout Dimensions cooling airflow Footprint and Floor cable accessFront FrontLocation Considerations Unit PreparationSee Notes 2 Front and rear access is required. See Notes 1 Liebert FPC heat outputFull Load Heat Output Unit kVA BTU/Hr kW Floor pedestal details Floor Pedestal InstallationPower and Control Wiring Additional Distribution Mounting & WiringInput Power Connections Liebert FDC Distribution MountingElectrical connection location for 23 584mm cabinet FPC15000 Rev FPC15002 Rev Suggested minimum input wire size data Main input circuit breaker interrupting rating Main input junction box electrical connections 4 wire Junction Box InstallationLow-voltage control junction box dimensions, typical Main input power junction box dimensions, typicalEquipment Grounding System GroundingGrounding Electrode Conductor for FPCs With Transformer Signal Reference GridMinimum grounding electrode conductor size AWG Output VoltageSystemTypical Liebert FPC without transformer grounding Typical Liebert FPC With transformer grounding arrangementOutput Power Connections Liebert FPC +24VDC Liebert FPCUnit EPO MainWiring Low Voltage Terminal StripFactory Optional Customer Alarm Inputs Summary Typical control wiring for units with monitoringWarranty ChecklistsInternal Inspection StartupPanelboard main circuit breaker torque specifications Torque specifications, generalBranch circuit breaker torque specifications Terminal block compression lug torque specificationsUnit Serial Number Unit Model Number Date InspectionStartup Monitoring System Check-Out Customer Alarms Normal System Shutdown Startup ProceduresNormal System Turn on Manual RestartAlarm Present/Silence Power Monitor PanelBasic Monitor Panel Units Without Monitoring FPC16000Operating Instructions Ascii interface default parameters RS-232 Ascii port customer commandsParameter Default Field # Data item Units Monitored parameters data definitionsInspection and Cleaning RepairInspection Schedule Page Iti Ne tTi n That