Basic Network Installation
Information Checklist
Before starting the basic network installation procedures, please ensure the following items are available or have been performed:
| Item | By |
|
| |
|
| |
An existing operational network utilizing TCP/IP is required, these | Customer | |
procedures are not designed to install a network. |
| |
|
| |
A suitable network cable. | Customer | |
|
| |
If you are going to configure TCP/IP manually, you need to obtain and | Customer | |
record the following information: |
| |
• | TCP/IP Address: |
|
• | Gateway Address: |
|
• | Subnet Mask Address: |
|
• Primary DNS Server Address: |
| |
Refer to the Glossary for additional information on the Gateway |
| |
Address, Subnet Mask Address and Primary DNS, if needed. |
| |
|
| |
Test the WorkCentre PE120i to ensure it is installed fully and | Customer | |
functioning correctly. |
| |
|
| |
WorkCentre PE120i print and fax drivers. | Xerox | |
|
|
|
CAUTION: Do not connect the network cable to the WorkCentre PE120i until instructed to do so.
Page | Xerox WorkCentre PE120i System Administration Guide |