SpectraLink 8000 Telephony Gateway Administration Guide
Mount the SpectraLink 8000 Telephony Gateway to rack
The Rack Mount Kit is designed for mounting equipment in a standard
•Mounting plates: Two for each Gateway to be mounted.
•Screws: Four rack mount screws for each Gateway to be mounted. Follow these steps to mount the Gateway to a rack:
1. Remove the corner screws from the Gateway.
2.Screw the
3.Screw the other end of the two mounting plates (oblong screw holes) to the rack. Connector A should be to the right.
Mount the SpectraLink 8000 Telephony Gateway to wall
Follow these steps to mount one SpectraLink 8000 Telephony
Gateway to a wall:
1.Using a 1/8” drill bit, drill four pilot holes, on 1.84” by 12.1” centers (approximately equivalent to
2.If installing only one SpectraLink 8000 Telephony Gateway, insert the #8 x 3/4” screws in the pilot holes and tighten, leaving a 1/8” to 1/4” gap from the wall. Position the SpectraLink 8000 Telephony Gateway with Connector A to the right (horizontal) or bottom (vertical).
3.Slide the SpectraLink 8000 Telephony Gateway over the screws until the unit drops into place in the keyhole opening.
Grounding instructions
Safety
Warning
The metal chassis of this unit may contain leakage currents (i.e., "touch" current) which is cumulative when multiple units are connected together to form a system. To prevent the summation of leakage currents from being present on exposed metal surfaces, the following installation procedure must be followed.
32 | PN: |