Install SpectraLink 8000 Telephony Gateway
Install IPC cables
To connect IPC cables on four or fewer SpectraLink 8000 Telephony Gateways (without a SpectraLink 8000 SVP Server):
1.Mount the SpectraLink 8000 Telephony Gateways.
2.Connect the IPC cable from the IPC OUT Port of the first unit to the IPC IN Port of the adjacent unit.
3.Repeat step 2 until all units are connected.
The following illustration shows a horizontally mounted system, with SpectraLink 8000 Telephony Gateway number one at the bottom.
OUT IN
IPC
OUT IN
IPC
OUT IN
IPC
OUT IN
IPC
|
|
| 1 | 2 | 3 | 4 | 5 |
L | A | C | E | STATUS |
| ||
N | C | O | R |
|
|
|
|
K | T | L | R |
|
|
|
|
ONETWORK O
KR
|
|
| 1 | 2 | 3 | 4 | 5 |
L | A | C | E | STATUS |
| ||
N | C | O | R |
|
|
|
|
K | T | L | R |
|
|
|
|
ONETWORK O
KR
|
|
| 1 | 2 | 3 | 4 | 5 |
L | A | C | E | STATUS |
| ||
N | C | O | R |
|
|
|
|
K | T | L | R |
|
|
|
|
ONETWORK O
KR
|
|
| 1 | 2 | 3 | 4 | 5 |
L | A | C | E | STATUS |
| ||
N | C | O | R |
|
|
|
|
K | T | L | R |
|
|
|
|
ONETWORK O
KR
CONN B
CONN B
CONN B
CONN B
PWR
!
CONN A
Maximum spacing between units 1/2 inch
PWR
!
CONN A
PWR
!
CONN A
PWR
!
CONN A
(Rack mount or horizontal wall mount formation, unit one is at the bottom)
No IPC cable is connected to the IN port of the first unit or to the OUT port of the last unit.
PN: | 35 |