3
Site Preparation
As shown in the system diagram in the previous section, the SpectraLink 8000 Telephony Gateway is connected to both the Ethernet switch and the wired telephone system; the SpectraLink 8000 SVP Server is connected to the Ethernet switch only. The specifications covered here allow for great flexibility in physical placement of the components within stated guidelines.
This unit must be installed by a service person familiar with the installation of electronic equipment.
Do not power up the unit before it has been properly grounded to a protective earth. See Chapter 6 Install SpectraLink 8000 Telephony Gateway - Grounding instructions.
Required Materials
The customer must provide the following equipment.
•Power Outlet(s): Must accept Polycom provided AC adapter, one for each SpectraLink 8000 Telephony Gateway and one for the SpectraLink 8000 SVP Server (if required). For multiple SpectraLink 8000 Telephony Gateway installations, provide power strips with sufficient outlets and
•
•25 Pair Cables:
•Backboard space: The SpectraLink 8000 Telephony Gateway and the SpectraLink 8000 SVP Server are designed to be wall mounted to 3/4” plywood securely screwed to the wall.
•Screws: Required to mount the SpectraLink 8000 Telephony Gateway and the SpectraLink 8000 SVP Server (if required) to the
PN: | 19 |