6. Maintenance and inspection
7. Attach the front panel.
Push the front panel toward the main body. ➀
Use a screwdriver to securely tighten (clockwise) the 4 screws on the front panel.➁
Tighten the 4 screws.
1
2
Battery replacement is now complete.
<After replacing the battery during operation...>
If the battery replacement indicator is displayed and the beeper sounds before replacement, press the beeper stop/test button once to stop the beeper, and hold it for 5 sec. to perform a
<After replacing the battery when operation was stopped...>
Connect the AC input plug to a wall outlet (commercial power) and turn ON the power switch of the UPS. When operation starts, the
Write the usage start date on the label on the front. Also, by using the included UPS monitor- ing software, possible to keep a record of usage start date by the software.
61