4.Thread two Upright Bolts (106) into each Upright (96, 107) in the indicated locations. Do not tighten the
Upright Bolts yet.
5.Next it will be necessary to adjust the incline of the INCLINE TRAINER. First, plug in the power cord (refer to page 10). Next, make sure that the on/off circuit breaker is in the on position (refer to step 2 on page 14). Place the Key (90) in the Console (89). Press the QUICK INCLINE button labeled “21” to adjust the in- cline to 21%. Then, remove the Key.
Move the on/off circuit breaker to the off position and unplug the power cord.
6.Thread two additional Upright Bolts (106) into each Upright (96, 107) in the indicated locations. Tighten all eight Upright Bolts in the Uprights.
7.Refer to step 2 on page 7 and tighten the four Handrail Bolts (93).
Place the Upright Caps (92) over the Handrail (94) and the upper ends of the Uprights (96, 107). Press the Handrail Caps against the
Upright Cap Screws.
4 |
| 96 | 107 |
|
|
| |
| 106 |
| 106 |
|
|
| |
5 |
| QUICK INCLINE | |
|
|
| buttons |
| 89 |
| 90 |
|
6 | 96 |
|
| 107 |
|
|
| 106 |
|
| 106 |
| 106 |
|
7 |
|
|
|
|
91 | 92 |
| 91 | 92 |
94 |
| 91 | ||
|
| 91 | ||
| 96 | 107 | ||
|
|
| ||
|
|
|
|
8