ICE FLASHER SERIES™ BASE ASSEMBLY
Perform the following
1.Assembling the transducer storage posts
2.Assembling the base and handle
3.Assembling the control head to the base and handle
1. Assembling the Transducer Storage Posts
In this procedureyou will install the posts to hold the transducer cable.
Nut |
|
Keyed Space of |
|
Cable Retention Arm |
|
Storage Post | Cable Retention |
| |
| Arm, facing out |
Spring |
|
Flat Head Screw |
|
1.Slide one spring over each flat-headscrew and set aside.
2.Insert a nut into the keyed space of each cable retention arm. Push down on the nut until it is flush with the surface of the cable retention arm.
3.Slide one cable retention arm over one storage post so that the arm faces out.
4.Hold the cable retention arm in place, and turn the base upside down.
5.Drop the assembled screw and spring straight into the back of the storage post. Using a
6.Repeat steps 2-5 for the second cable retentionarm.
6