Emerson
PRODUCT CERTIFICATIONS Rosemount 3095 with HART, Approved Manufacturing Locations
Install
Signal Termination
Basic Configuration Parameters
RTD Connector
Consider Housing Rotation
Page 18
Page 17
Page 19
Image 18
Page 17
Page 19
Contents
Fieldbus Protocol Rosemount 3095MF Series Flowmeter Transmitter
Quick Installation Guide
Rosemount 3095 MultiVariable
¢00825-0100-4716/¤
Electrical shock can result in death or serious injury
Explosions could result in death or serious injury
Process leaks may cause harm or result in death
IMPORTANT NOTICE
Terminal Block HART O-ring Cover
TRANSMITTER EXPLODED VIEW
RTD Connector
Certification Label Electronics Board Nameplate Module O-ring
Gas Flow Applications
STEP 1 MOUNT THE TRANSMITTER
Liquid Flow Applications
Steam Flow Applications
STEP 2 TRANSMITTER INSTALLATION
Consider Housing Rotation
Field Installation
STEP 2 CONTINUED
Figure 2. Alarm Jumper Location
Figure 3. Armored Shielded RTD Cable
Figure 4. Shielded RTD Cable
Cable Adapter 1/2-14 NPT Black Cable Connector
Cable Gland Black Cable Connector/ RTD Connector
Figure 5. ATEX/IECEx Flameproof RTD Cable
Bolting Considerations
Figure 6. Common Transmitter Assemblies
O-ring
O-rings with Flange Adapters
Flange Adapter
PTFE Based
STEP 3 SOFTWARE INSTALLATION
3095 Engineering Assistant EA for HART Software Installation
STEP 3 CONTINUED
Installing the HART Modem
3095 Engineering Assistant EA for FOUNDATION Fieldbus
3. Select Hart Modem
STEP 4 CONNECT WIRING AND POWER UP HART
24 Vdc Supply Current RL≥ 250Ω Meter
Power Conditioner
STEP 4 CONNECT WIRING AND POWER UP FIELDBUS
Power Supply
Shield Wire Ground
Send the Configuration to the Transmitter
STEP 5 CONFIGURE THE TRANSMITTER HART
Setting the Loop to Manual
Basic Configuration Parameters
Function/Variable
STEP 5 CONFIGURE THE TRANSMITTER FIELDBUS
To configure the AI Block
AI Block configuration parameters
Using the Foundation Fieldbus Host System
Using the Field Communicator
Using the Foundation Fieldbus AI Block
STEP 6 TRIM THE TRANSMITTER
European Directive Information
PRODUCT CERTIFICATIONS Rosemount 3095 with HART
Approved Manufacturing Locations
Rosemount 3095 HART Hazardous Locations Certifications
Canadian Standards Association CSA
European Certifications
Special Conditions for Safe Use
IECEx Certifications HART
Conditions of Certification
INMETRO Certifications
China NEPSI Certifications
Special conditions for safe use
L i ≈
Maximum Temperature of
ATEX Directive 94/9/EC
Rosemount 3095 with Fieldbus
Combinations of Certifications
European Pressure Equipment Directive PED 97/23/EC
FM Approvals
Rosemount 3095 Fieldbus Hazardous Locations Certifications
North American Certifications
Canadian Standards Association CSA
Special conditions for safe use
IECEx Certifications Fieldbus
Quick Installation Guide
Rosemount 3095 MultiVariable
Combinations of Certifications
Quick Installation Guide
Rosemount 3095 MultiVariable
Quick Installation Guide
Rosemount 3095 MultiVariable
Quick Installation Guide
Rosemount 3095 MultiVariable
Quick Installation Guide
Rosemount 3095 MultiVariable
Related pages
All Install page
Install the USB, Ethernet or serial cable for Sierra Wireless MP 875
Chapter 2 System Requirement and Installation for Siemens CL-010
Installing the CF adapter and CompactFlash card for Konica Minolta C20P
Installing batteries in the remote control for Yamaha RX-V563
Step By Step Installation-remote gain control RGC-1-option for Orion Car Audio HCCA-D600
Electroluxinstallation51 for Electrolux EOD67642
Schnellinstallation for ViewSonic VX1962wm
Installing the Software for GoVideo RX128
Uninstall procedures for Pioneer PDK-50HW3
Installing the Update Data to the Facsimile Equipment for Brother FAX-8650P
Where can I find detailed
Creda Reflection oven
operations?
Top
Page
Image
Contents