Emerson Rosemount 3095 MultiVariable, Quick Installation Guide, Combinations of Certifications

Page 28
Manual background

Quick Installation Guide

Rosemount 3095 MultiVariable

00825-0100-4716, Rev DA October 2009

7IECEx Flameproof

Certificate Number: IECEx KEM 06.0018 Zone 0/1 Ex d IIC T6 (-20°C Ta 65°C) Zone 0/1 Ex d IIC T5 (-20°C Ta 80°C) Vmax = 55 Vdc

Imax = 23 mAdc

8IECEx Dust

Certificate Number: IECEx KEM 06.0018 Ex tD A22 T90°C

IP66

Combinations of Certifications

Stainless steel certification tag is provided when optional approval is specified. Once a device labeled with multiple approval types is installed, it should not be reinstalled using any other approval types. Permanently mark the approval label to distinguish it from unused approval types.

BA and J combination D C and K combination

L F, G, H, and P combination 6 T, G, H, and P combination 9 4, 5, 7, and 8 combination

28

Image 28
Contents Quick Installation Guide Rosemount 3095 MultiVariableFieldbus Protocol Rosemount 3095MF Series Flowmeter Transmitter ¢00825-0100-4716/¤Explosions could result in death or serious injury Process leaks may cause harm or result in deathElectrical shock can result in death or serious injury IMPORTANT NOTICETRANSMITTER EXPLODED VIEW RTD ConnectorTerminal Block HART O-ring Cover Certification Label Electronics Board Nameplate Module O-ringSTEP 1 MOUNT THE TRANSMITTER Liquid Flow ApplicationsGas Flow Applications Steam Flow ApplicationsConsider Housing Rotation STEP 2 TRANSMITTER INSTALLATIONField Installation Figure 2. Alarm Jumper Location STEP 2 CONTINUEDFigure 3. Armored Shielded RTD Cable Cable Adapter 1/2-14 NPT Black Cable Connector Cable Gland Black Cable Connector/ RTD ConnectorFigure 4. Shielded RTD Cable Figure 5. ATEX/IECEx Flameproof RTD CableBolting Considerations Figure 6. Common Transmitter AssembliesO-rings with Flange Adapters Flange AdapterO-ring PTFE BasedSTEP 3 SOFTWARE INSTALLATION 3095 Engineering Assistant EA for HART Software InstallationInstalling the HART Modem 3095 Engineering Assistant EA for FOUNDATION FieldbusSTEP 3 CONTINUED 3. Select Hart ModemSTEP 4 CONNECT WIRING AND POWER UP HART 24 Vdc Supply Current RL≥ 250Ω MeterSTEP 4 CONNECT WIRING AND POWER UP FIELDBUS Power SupplyPower Conditioner Shield Wire GroundSTEP 5 CONFIGURE THE TRANSMITTER HART Setting the Loop to ManualSend the Configuration to the Transmitter Basic Configuration ParametersQuick Installation Guide To configure the AI Block STEP 5 CONFIGURE THE TRANSMITTER FIELDBUSAI Block configuration parameters Using the Field Communicator Using the Foundation Fieldbus AI BlockUsing the Foundation Fieldbus Host System STEP 6 TRIM THE TRANSMITTERPRODUCT CERTIFICATIONS Rosemount 3095 with HART Approved Manufacturing LocationsEuropean Directive Information Rosemount 3095 HART Hazardous Locations CertificationsEuropean Certifications Canadian Standards Association CSASpecial Conditions for Safe Use IECEx Certifications HART Conditions of Certification INMETRO CertificationsSpecial conditions for safe use China NEPSI CertificationsL i ≈ Maximum Temperature of Rosemount 3095 with Fieldbus Combinations of CertificationsATEX Directive 94/9/EC European Pressure Equipment Directive PED 97/23/ECRosemount 3095 Fieldbus Hazardous Locations Certifications North American CertificationsFM Approvals Canadian Standards Association CSAQuick Installation Guide IECEx Certifications Fieldbus Rosemount 3095 MultiVariable Quick Installation GuideCombinations of Certifications Quick Installation Guide Rosemount 3095 MultiVariableQuick Installation Guide Rosemount 3095 MultiVariableQuick Installation Guide Rosemount 3095 MultiVariableQuick Installation Guide Rosemount 3095 MultiVariable