G | Orange |
|
|
H | White/Orange |
|
|
I | RJ45 Connector viewed from top with tang underneath |
|
|
J | Cat 5e Cable |
|
|
K | Shield |
|
|
Terminating a Northstar 8000i RJ45 Field Kit
1.Cut the network cable to the desired length
2.Slide the strain relief boot on to the cable
3.Slide the locking nut on to the cable
4.Slide the connector collar on to cable
5.Remove 1½" (38.1 mm) of outer cable sleeve.
6.Remove the foil shield and plastic film. There is no need to strip the individual wires
7.Untwist the twisted paired wires.
8.Arrange them in the order as shown in the diagram above. From left to right. The shield is bent backwards
Northstar 8000i System - 12" Display Processor Installation Manual
54