AEG 8000012364 BAL operating instructions Disconnection, Parallel INV operation

Page 28

"UniVert 2" inverter

Parallel INV operation:

Switch off the INV, switch on miniature circuit-breaker F1

Set the DIL switches

Insert the AC fuses

Connect the DC supply

Switch on all INVs one after the other

(The output contactors K7 of the INVs start at the same time as soon as n-R INV have been switched on)

Connect the load

Individual or parallel operation with SBS

Switch off the INVs, switch on miniature circuit-breaker F1

Set the DIL switches (INV and SBS)

Engage the AC fuses (INV output)

Engage the AC mains and output fuses of the SBS

Disconnect the manual bypass

Connect the load

Connect the DC supply

Switch on all INVs one after the other

(The K7 output contactors of the INVs start at the same time as soon as the last INV has been switched on and the INVs have synchronised to the mains.)

NOTE:

i Before switching on the INVs in parallel operation, or the SBS, make sure the setting of the DIL switches is correct (see chapters 3.9 and 4.11)!

INVs in parallel operation must be set to the same output voltage, to the same number of INVs in the system and to different addresses!

5.4Disconnection

i

Even when switched off, the inverter can still be live due to charged capacitors and external signals. For this reason the terminals must be tested prior to dismantling the unit to ensure that they are de-energised.

The capacitors can be discharged via an external resistor on terminals X2 or X1: L+ and L-.

Switch off the INV

Switch off the AC fuses, if present Switch off the DC supply

Disable interfaces X6, X7, X3 Disconnect earthing

NOTE:

Before switching off an INV in the parallel system, check whether the remaining INVs can take over the entire load. If necessary, the load current must be reduced by switching off individual loads!

Page 28 of 42

8000012364 BAL, en

Image 28 Contents
Operating Instructions UniVert 2 inverter and SBS option Warranty Duty to Provide InformationValidity HandlingHotline AbbreviationsCopyright Table of Contents Technical Data Maintenance TroubleshootingDimensional Drawing Important Instructions and Explanations Safety InstructionsAccident Prevention Regulations Qualified Personnel Safety Awareness ApplicationLiability DirectivesGeneral Information System DescriptionFunction of the System Individual INV operationParallel INV operation Individual or parallel operation with SBSParallel INV operation Block diagram of the inverter Description of the INVPrinciple of Operation of the INV, Electrical Description of the SBS SBSPrinciple of Operation of the SBS, Electrical Function of the Inverter ON/OFF Switch DIL SwitchCan Bus Interfaces X6 S2.1 S2.2 S2.3Switches S2.4, S2.5 and S2.6 Own Address INV Switches S2.7 and S2.8 Number of redundant INVsINVs Settings must be the same on all INVs and the SBS S2.4 S2.5 S2.6 AddressSignalling, Displays and Remote Signals Display Colour Operating statusFunction of the SBS optional Switchback AttemptsOperating Statuses Reset Button AC Mains InputAC Busbar AC Mains Monitoring SystemS3.1 S3.2 S3.3 S3.7 S3.8 INVs Switchover without gap Assignment of the signal terminalsOperating modes Switchover with gap Installation Connecting the Loads / DC / MainsStart-Up ConnectionDisconnection Maintenance Output Voltage Deviation TroubleshootingFor systems with SBS additionally Technical Data General Data INVFault Overtemperature ϑCollective fault OperationGeneral Data SBS With safe isolation at UO ≤ 60 V DC UniVert 2 inverter Electrical Data At 24 Type E-number G110 E230/10,9/2rfg-CFp2,5 3000000263 Type E-number E230 E230/115/2-VFp26,5-8 3000000646 Dimensional Drawing Inverter dimensions type 1.5 and 3.3 kVAInverter dimensions type 2.5 kVA SBS dimensions