6 Maintenance

Attention! Disconnect the unit from the power supply prior to all maintenance work. Always observe the safety instructions! (See chapter 1.)

The INV consists of state-of-the-art components which are almost non-wearing. We do, however, recommend regular visual and functional tests of the unit to maintain its continuous availability and operational reliability.

When visually inspecting the unit, check whether:

there is any mechanical damage or foreign bodies are present,

any conductive dirt or dust has accumulated in the unit, and whether

accumulation of dust affects heat supply and dissipation.

If large quantities of dust have accumulated, the unit should as a precaution be cleaned with dry compressed air, in order to ensure adequate heat dissipation.

The intervals at which visual checks should be performed are largely determined by the site conditions. The unit must not be operated in an aggressive atmosphere.

Page 29 of 42

8000012364 BAL, en

Image 29
Contents Operating Instructions UniVert 2 inverter and SBS option Duty to Provide Information WarrantyValidity HandlingCopyright AbbreviationsHotline Table of Contents Dimensional Drawing Maintenance TroubleshootingTechnical Data Accident Prevention Regulations Safety InstructionsImportant Instructions and Explanations Qualified Personnel Application Safety AwarenessDirectives LiabilitySystem Description General InformationIndividual INV operation Function of the SystemParallel INV operation Individual or parallel operation with SBSParallel INV operation Description of the INV Block diagram of the inverterPrinciple of Operation of the INV, Electrical SBS Description of the SBSPrinciple of Operation of the SBS, Electrical Function of the Inverter DIL Switch ON/OFF SwitchCan Bus Interfaces X6 S2.1 S2.2 S2.3Switches S2.7 and S2.8 Number of redundant INVs Switches S2.4, S2.5 and S2.6 Own Address INVINVs Settings must be the same on all INVs and the SBS S2.4 S2.5 S2.6 AddressDisplay Colour Operating status Signalling, Displays and Remote SignalsOperating Statuses Switchback AttemptsFunction of the SBS optional AC Mains Input Reset ButtonAC Busbar AC Mains Monitoring SystemS3.1 S3.2 S3.3 S3.7 S3.8 INVs Operating modes Assignment of the signal terminalsSwitchover without gap Switchover with gap Connecting the Loads / DC / Mains InstallationStart-Up ConnectionDisconnection Maintenance For systems with SBS additionally TroubleshootingOutput Voltage Deviation General Data INV Technical DataOvertemperature ϑ FaultCollective fault OperationGeneral Data SBS With safe isolation at UO ≤ 60 V DC UniVert 2 inverter Electrical Data At 24 Type E-number G110 E230/10,9/2rfg-CFp2,5 3000000263 Type E-number E230 E230/115/2-VFp26,5-8 3000000646 Inverter dimensions type 1.5 and 3.3 kVA Dimensional DrawingInverter dimensions type 2.5 kVA SBS dimensions