"UniVert 2" inverter
Parallel INV operation:
Prerequisite for parallel operation is that the INVs on the DC and AC side are connected in parallel, interconnected via CAN bus
The loads are only supplied with voltage when
When the DC undervoltage monitoring value is reached, the INVs are switched off. If the battery is charged after the mains voltage has returned, the INVs are automatically started when a limit value of the DC undervoltage monitoring is exceeded. The K7 output contactors of the INVs are switched on when
In order to be able to remove one INV from the interconnected system for maintenance or repair work, we recommend providing a DC and an AC fuse for each INV.
Individual or parallel operation with SBS:
Prerequisite for operation with SBS is that the INV and SBS are connected in parallel on the AC side, interconnected via
CAN bus (X7) and correctly addressed. The general behaviour of an individual INV is as described in the two previous paragraphs. Under normal conditions, the INVs are operating synchronously with the mains and supply the AC loads. In the event of a voltage drop on the load busbar caused by the short circuit of an AC load or the failure,
In order to be able to disconnect the SBS from the mains and the AC busbar for maintenance or repair work, we recommend providing an AC fuse for both sides and supply the loads via the manual bypass.
Page 12 of 42 | 8000012364 BAL, en |