| Upgrading CMS to the High Availability Option | CentreVu CMS R3V8 High Availability |
|
|
| Connectivity, Upgrade and Administration |
|
| Setting Up CMS on an HA Server |
| |
|
|
|
|
21.Enter the number of splits/skills in this ACD. The program responds:
Total split/skill members, summed over all splits/skills
22.Enter the maximum number of split/skill members that will be logged into this ACD simultaneously, considering shift overlap.
•For
•For EAS, sum all
If it is not possible to sum the number of splits/skills for each agent, you can determine the capacity needed by multiplying the total number of agents by the average number of splits/skills per agent. The program responds:
Number of shifts
23.Enter the number of shifts. The program responds:
Enter the start time for shift 1 (hh:mmXM):
24.Enter the start time for shift 1; for example, 08:00am. The program responds:
Enter the stop time for shift 1 (hh:mmXM)
: