EXP1240 System Installation GuideRevision 06
Table 5: Sample multi-cell system information
Base Station | RPN (assigned by system) | Synchronization Source |
|
|
|
Base #0 | 00 | RPN 00 (self) |
|
|
|
Base #1 | 04 | RPN 00 (Base #0) |
|
|
|
Base #2 | 08 | RPN 00 (Base #0) |
|
|
|
Base #3 | 0C | RPN 04 (Base #1) |
|
|
|
Base #4 | 10 | RPN 08 (Base #2) |
|
|
|
Base #5 | 14 | RPN 0C (Base #3) |
|
|
|
Base #6 | 18 | RPN 10 (Base #4) |
|
|
|
Base #7 | 1C | RPN 10 (Base #4) |
|
|
|
Setting Up a Multi-cell System
The table below shows a
Table 6: Summary: Multi-cell system configuration
Step | Screens used | ||
|
|
| |
1. | Place the primary base station at its final location. | NA | |
|
|
| |
2. | Configure the primary base station. | Multicell | |
|
|
| |
3. | Reboot the primary base station and verify the settings. | Home/Status | |
|
|
| |
4. | Place each Level 1 base station at its final location. | NA | |
|
|
| |
5. | Configure each Level 1 base station and reboot. | ||
Home/Status | |||
|
| ||
|
|
| |
6. | Synchronize each Level 1 base station. | ||
|
|
| |
7. | Repeat the process with each Level 2 base station. | ||
Home/ Status | |||
|
| ||
|
|
| |
8. | Repeat the process with any base stations at Level 3 through | ||
| Level 6. | Home/Status | |
|
|
|
© 2013 Uniden America Corp. | PROPRIETARY AND CONFIDENTIAL | Page 31 of 71 |