Woodstock M1109 owner manual Box Bellingham, Wa

Page 72

FOLD ALONG DOTTED LINE

Place

Stamp

Here

WOODSTOCK INTERNATIONAL INC.

P.O. BOX 2309

BELLINGHAM, WA 98227-2309

FOLD ALONG DOTTED LINE

TAPE ALONG EDGES--PLEASE DO NOT STAPLE

Image 72
Contents Combo LATHE/MILL Page Contents Parts Specifications IntroductionWoodstock Technical Support Controls and Features Safety Standard Safety InstructionsSafety Additional Safety Instructions for Lathe/Mills Avoiding Potential Injuries Always protect the bed ways,Electrical 220V OperationExtension Cords GroundingSetup Installed Accessories Figure QtyPackaged Accessories Figure InventoryCleaning Machine Machine PlacementUncrating and Lifting To unpack and move the lathe/mill, do these stepsTo begin the test run procedure, do these steps Troubleshooting onTest Run and Break-In Power Supply Lathe OperationsGeneral Disconnect Power to the LATHE/MILL Chuck and Faceplate MountingReplacing Jaws To remove a set of jaws, do these stepsUsing the Four-Jaw Chuck Clamping workpieceUsing the Faceplate Faceplate installedUsing the Tailstock To install the MT#3 drill chuck, do these stepsDrilling with the Tailstock To use the tailstock, do these stepsTo setup the tailstock to cut tapers, do these steps Cutting Shallow Tapers With the TailstockTailstock Alignment To align the tailstock, do these stepsTailstock adjustment option #2 Using Centers To install a dead or live center, do these stepsUsing the Steady Rest Using the Follow RestTo use the steady rest, do these steps Setting Compound Slide Using the Tool PostTo set the angular position, do these steps Using Manual Feed Longitudinal HandwheelSetting RPM To determine and set the needed cutting RPM, do these stepsCutting Speeds for High Speed Steel HSS Cutting Tools Setting Power Feed Rate Refer to the Change Gear Chart on Page 29, orThreading Setup To setup for threading, do these stepsLoosen the apron lock bolt and use the feed lever Figure Change Gear Chart Installing Tools To install a tool in the spindle, do these stepsMilling Operations Removing ToolsHeadstock Positioning Quill TravelTo position the spindle head vertically, do these steps To use the quill, do these stepsTo begin the start up procedure, do these steps Table TravelHigh speed steel cutting chart Maintenance General MaintenanceGeneral Cleaning General LubricationAdjusting/Replacing the V-Belt To replace or adjust the V-belts, do these stepsService Cross Slide, Half-Nut Compound Slide Gib AdjustmentsCross Slide Backlash Electrical Component and Connection Index M1109 Electrical panelElectrical Connections ContactorTransformer connection Wiring Diagram Lathe controlsTroubleshooting Motor & ElectricalOperation and Work Results Parts Diagram Series Parts List PART# DescriptionThread Dial Diagram 1007 1028SPANNERNUTM16-1.5 Leadscrew Gearbox Diagram 2000 Series Parts Coverplate Compound Rest and Tool Post Diagram FEMALEKNOB5/16-18 Bed Diagram 3000 Series Parts BED Steady Rest and Follow Rest Diagram Pinnedknob Apron Diagram XPK81M Tailstock Diagram STEELBALL8MM Mill Column Diagram XPLW05M LOCKWASHER12MM Headstock Diagram 7000 Series Parts XPR12M EXTRETAININGRING35MM Accessories and Labels Diagram 6THREE-JAWCHUCK Main Wiring Box Diagram Parts Warranty Warranty Registration CommentsBOX BELLINGHAM, WA