Conair CTS 5, CTS 9, CTS 7 manual Unpacking the Boxes, Carefully uncrate the saw and its components

Page 20

UNPACKING THE BOXES

The CTS Saw comes fully assembled in a single crate.

CAUTION: Lifting

To avoid personal injury or damage to the saw lift the saw using a forklift or hoist with straps that have been positioned at the saw's center of gravity.

1

2

Carefully uncrate the saw and its components.

Remove all packing material, protective paper, tape, and plastic. Compare contents to the shipping papers to ensure that you have all the parts.

3

Carefully inspect all components to make sure no damage occurred during shipping. Check all wire ter- minal connections, bolts, and any other electrical connec- tions, which may have come loose during shipping.

4

Record serial numbers and specifications in the blanks provided on the back of the User Guide's title page. This information will be helpful if you ever need service or parts.

5

You are now ready to begin installation.

Complete the preparation steps on page 3-3.

3-2

INSTALLATION

CTS Saw

UGE058/0803

Image 20
Contents Traveling Saw Date Document Number Table of Contents Troubleshooting Introduction Your Responsibility AS a User Purpose User GuideHOW the User Guide is Organized Read this SO no ONE Gets Hurt Read this SO no ONE Gets Hurt HOW to USE Lockout Device Turn the rotary disconnect switch to OFF or O positionPage Description What is Typical ApplicationsHOW the CTS SAW Works SAW Works Features CTS SAWSpecifications Optional Equipment Left to right machine operationPage Installation Unpacking the Boxes Carefully uncrate the saw and its componentsPreparing for Installation You need these tools for installationDetermine the best distance from the belt puller to Positioning the CTS SAWMove the saw into position. Place the saw in posi Position the SAW Connecting Main Power Source Installing the Encoder Installing the SAW Blades Remove the hex nutPreparing for Testing Testing the InstallationPage Operation SAW Control Control Features Blade Height Adjustment Machine Frame Support SystemUpper Clamp Adjustment Power SupplyTo remove and/or adjust each clamp assembly Control PanelsPneumatic Cylinder Operation Electrical Operation Machine Lubrication System InspectionBlade Replacement Wait at least five minutes for the blade to stop completelyChip Collection Shrouds Blower Connection Maintenance Maintenance Features Maintenance Maintenance Overview Preventative Maintenance ScheduleChecking saw blades Inspecting the blade mounting hardwareWeekly Checking Blades Checking Electrical Connections Open the electrical enclosure Close the electrical enclosure doorTroubleshooting Before Beginning FEW Words of CautionIdentifying Cause of a Problem Electrical Problems Symptom Possible cause SolutionProduct Quality Problems Incorrect blade designIncorrect cooling ExtrudateProblem Puller problem Counter problemRodless cylinder problem Solenoid problemChecking Servo Amplifier Checking the Encoder Check all connectionsCheck the encoder cable for damage. If neces Check the encoder itself. There should be no playWE’RE Here to Help From outside the United States, callAppendix A-2 Conair Servo Traveling Saw Soft KeysLCD Screen Numeric keysFixed Function Keys at Bottom Contents Power Up Sequence Starting CommsOn/Off Softkey Main ScreenLength Counter Reset Softkey Total SoftkeyTotal Screen Exit SoftkeyLength Softkey Enter or Delete?Homing Home SeekHome Already Menu Area Maint. SoftkeyChange Softkey Maint. AreaR c t n S o f t k e y S o f t k e y Time SoftkeyCycles Softkey B l e S o f t k e yT u r n S o f t k e y Acceptable range is 120.00-1800.00 ipmV a n c e S o f t k e y 20%Error Message Menu Area Factory SoftkeyBlades Opt Table Assembly, Pneumatic / ServoGeneral Equipment Parts List To Order Parts Call Toll Free 800 Servo Opt. / Table TravelElectrical Control, 3hp 230/460v Volt