Power Up Sequence

At power up a series of system screens briefly appear. The software is Red Lion’s Edict-97. This screen or similar shows first.

Edict - 97 Runtime

Ver . 5 . 05 . 117

Next, the Communications message appears

**STARTING COMMS**

If there are any problems with communications, this screen will remain on longer than a couple of seconds.

If there are no communication problems the Conair Servo Traveling Saw program will begin to run. The following

CONAIR SERVO SAW

Version 1 . 1

message or similar shows for 5-seconds.

After the 5 second delay the Main Screen will appear.

Appendix B-1 (4)

Image 60
Contents Traveling Saw Date Document Number Table of Contents Troubleshooting Introduction Purpose User Guide HOW the User Guide is OrganizedYour Responsibility AS a User Read this SO no ONE Gets Hurt Read this SO no ONE Gets Hurt HOW to USE Lockout Device Turn the rotary disconnect switch to OFF or O positionPage Description What is Typical ApplicationsHOW the CTS SAW Works SAW Works Features CTS SAWSpecifications Optional Equipment Left to right machine operationPage Installation Unpacking the Boxes Carefully uncrate the saw and its componentsPreparing for Installation You need these tools for installationPositioning the CTS SAW Move the saw into position. Place the saw in posiDetermine the best distance from the belt puller to Position the SAW Connecting Main Power Source Installing the Encoder Installing the SAW Blades Remove the hex nutPreparing for Testing Testing the InstallationPage Operation SAW Control Control Features Blade Height Adjustment Machine Frame Support SystemUpper Clamp Adjustment Power SupplyTo remove and/or adjust each clamp assembly Control PanelsPneumatic Cylinder Operation Electrical Operation Machine Lubrication System InspectionBlade Replacement Wait at least five minutes for the blade to stop completelyChip Collection Shrouds Blower Connection Maintenance Maintenance Features Maintenance Maintenance Overview Preventative Maintenance ScheduleChecking saw blades Inspecting the blade mounting hardwareWeekly Checking Blades Checking Electrical Connections Open the electrical enclosure Close the electrical enclosure doorTroubleshooting Before Beginning FEW Words of CautionIdentifying Cause of a Problem Electrical Problems Symptom Possible cause SolutionProduct Quality Problems Incorrect blade designIncorrect cooling ExtrudateProblem Puller problem Counter problemRodless cylinder problem Solenoid problemChecking Servo Amplifier Checking the Encoder Check all connectionsCheck the encoder cable for damage. If neces Check the encoder itself. There should be no playWE’RE Here to Help From outside the United States, callAppendix A-2 Conair Servo Traveling Saw Soft KeysNumeric keys Fixed Function Keys at BottomLCD Screen Contents Power Up Sequence Starting CommsMain Screen Length CounterOn/Off Softkey Reset Softkey Total SoftkeyTotal Screen Exit SoftkeyLength Softkey Enter or Delete?Homing Home SeekHome Already Menu Area Maint. SoftkeyMaint. Area R c t n S o f t k e yChange Softkey S o f t k e y Time SoftkeyCycles Softkey B l e S o f t k e yT u r n S o f t k e y Acceptable range is 120.00-1800.00 ipmV a n c e S o f t k e y 20%Error Message Menu Area Factory SoftkeyTable Assembly, Pneumatic / Servo GeneralBlades Opt Equipment Parts List To Order Parts Call Toll Free 800 Servo Opt. / Table TravelElectrical Control, 3hp 230/460v Volt