Modular UnitsFor units with multiple main air- conditioning sections, connect the high voltage compressor power wiring to the line side of the high voltage terminal block in the second section’s high voltage electrical box. This wiring is located in the upper portion of the compressor compartment.

Connect the low voltage wiring, located in the compressor compartment, between the two air conditioning sections using the quick connects provided.

For the supply fan motor, connect the 3-phase high voltage wiring, coiled behind the high voltage panel, to the line side of the supply fan motor terminal block located in the fan compart- ment. For VAV units, connect the 3-phase high voltage wiring to the line side of VFD.

For units with multiple fans, connect the control power wiring with the quick connects provided at the fan compart- ment junction.

CONTROL WIRING (CV Only) — A standard commercial thermostat controls constant volume units. These units turn compressors on or off in response to zone temperature. The 50BV units provide 2 stages of cooling.

50BVC,E,Q020-034 and 50BVT,U,V034 Only — These models have 2 independent refrigerant circuits, each capable of being staged independently. Thermostat wiring is connected to the 6-position low voltage terminal block located in the unit electrical box. The 50BV units have a 24-VAC control transformer, which provides power to the control circuit and to the thermostat. The thermostat connections and their functions are as follows:

C Transformer 24-v ac Common

OReversing Valve (heat pumps only)

Y1 1st Stage Compressor Contactor

Y2 2nd Stage Compressor Contactor R Transformer 24-v ac Hot

G Indoor Fan Contactor

Select an appropriate commercial thermostat that has 2 stag- es of cooling control. If the unit is a heat pump, make sure the thermostat is capable of heat pump control. Any of the Debonair® series commercial thermostats will meet the re- quirements, and are available in a variety of attractive styles, in programmable and non-programmable versions.

Install the thermostat in the space where the temperature is being controlled, according to the instructions provided with the thermostat.

Fig. 24 — Typical Wiring 18 to 30 Ton Units WARNING

Before wiring the thermostat to the unit, make sure that main power to the unit has been disconnected. Failure to heed this warning could result in personal injury.

To wire the thermostat:

1.Connect the ‘C’ terminal from the 50BV unit to the ‘C’ terminal on the thermostat.

2.Wire the ‘Y1’ and ‘Y2’ terminals from the 50BV unit to the ‘Y1’ and ‘Y2’ terminals, respectively, at the thermostat.

3.Make a connection between the ‘G’ terminal on the unit and the ‘G’ terminal on the thermostat.

4.Attach a wire from the ‘R’ terminal at the unit to the ‘R’ terminal at the thermostat.

5.50BVQ and 50BVV ONLY: If the unit is a heat pump, connect a final wire from terminal ‘O’ on the heat pump unit to the ‘W1/O/B’ terminal at the thermostat. Configure the thermostat for heat pump operation using the installation instructions provided with the thermostat. Set the reversing valve polarity of the thermostat to ‘O’.

See Fig. 24 for typical thermostat wiring.

THERMOSTAT

a50-7272ef

 

B

 

O

 

TYPICAL

Y2 R W1 Y1 G

C

 

 

UNIT

 

 

C

 

24 VAC COMMON

O

 

FAN RELAY

 

 

 

COMPRESSOR RELAY

Y1

 

 

Y2

 

HEAT PUMP

 

 

24 VAC RETURN

R

 

2nd STAGE COMPRESSOR RELAY

G

 

 

Fig. 24 — Typical Wiring 18 to 30 Ton Units

(Two-Stage Cooling Units)

50BVT,U,V044-064 Only — Units larger than 30 tons have 4 independent refrigerant circuits.

These units can be controlled using a standard commercial, 2-stage thermostat. In this case, the first stage of cooling will turn on compressors 1 and 2, and the second stage will turn on compressors 3 and 4. It is also possible to have 4 stages of cool- ing, using a suitable field-supplied control method.

For 2-stage thermostat wiring, refer to Fig. 25. Jumpers must be installed between the G and O terminals in Modules A and B. A field-supplied, 24-v pilot relay should be used to en- ergize Y2 on Module B whenever Y1 is energized on Module A. Similarly, a field-supplied 24-v pilot relay should be in- stalled to energize Y4 on Module B whenever Y3 on Module A is energized (Y2 stage of thermostat calls for cooling).

Finally, verify that transformer phasing is consistent between Modules A and B.

REMOTE CONDENSER FAN CONTACTOR WIR- ING — For units up to 30 tons, one remote condenser is required. Install a field-supplied 24-v pilot relay (Aux relay) between Y1 and C. This will energize the FC contactor on the remote condenser whenever there is a call for cooling.

For 40 to 60 ton units, 2 remote condensers are required. Be sure to make piping connections so that compressors 1 and 2 are connected to condenser 1, and compressors 3 and 4 are connect- ed to condenser 2. Use an additional set of NO (normally open) contacts on PR1 to energize FC1 on condenser 1, and a set of NO contacts on PR2 to energize FC1 on condenser 2.

CONTROL WIRING (VAV Only) — The VAV units are de- signed to operate either with a building management system or stand alone (local control).

Carrier Comfort Network® Control Wiring — The CC6400 Control Module connects to the Carrier Comfort Network (CCN) bus in a daisy chain arrangement. Negative pins on each component must be connected to respective negative pins and likewise positive pins on each component must be connected to respective positive pins. The controller signal pins must be wired to the signal ground pins. Wiring connections for CCN must be made at the 3-pin plug.

At any baud rate (9600, 19200, 38400 baud), the number of controllers is limited to 239 devices maximum. Bus length may not exceed 4000 ft, with no more than 60 total devices on any 1000-ft section. Optically isolated RS-485 repeaters are required every 1000 ft.

NOTE: Carrier device default is 9600 baud.

The CCN communication bus wiring is field supplied and field installed. It consists of shielded 3-conductor cable with drain (ground) wire. The cable selected must be identical to the CCN communication bus wire used for the entire network. See Table 10 for cable recommendations.

27

Image 27
Contents Installation, Start-Upand Service Instructions CONTENTSSAFETY CONSIDERATIONS GENERAL MAJOR SYSTEM COMPONENTS Constant Volume CV Unitsa50-7257ef INSTALLATIONStep 1 - Complete Pre-InstallationChecks Table 2 - Modular Unit Shipping TableFig. 2 - 50BVC,J,Q020-034Dimensions Fig. 3 - 50BVE,K020-034Dimensions a50-8201 Fig. 4 - 50BVT,V,W034 High-BoyDimensionsFig. 5 - 50BVT,V,W034 Low-BoyDimensions Fig. 6 - 50BVT,V,W044-064 High-BoyDimensions Fig. 7 - 50BVT,V,W044-064 Low-BoyDimensions Fig. 8 - 50BVU,X034 High-BoyDimensions Fig. 9 - 50BVU,X034 Low-BoyDimensions Fig. 10 - 50BVU,X044-064 High-BoyDimensions Fig. 11 - 50BVU,X044-064 Low-BoyDimensions a50-7306ef NOTES 1.Dimensions in inches mma50-7307ef NOTES 1.Dimensions in inches mmShipping Weights lb a50-8235Size 034 Units Size 044-064Units Table 3A - Physical Data - 50BVC,E,J,K,Q Table 3B - Physical Data - 50BVT,U,V,W,X Multiple Fan Units Fig. 15 - Typical Fan Discharge Connections fora50-7267ef a50-7138efFig. 16 - Duct Static Pressure Probe P/N 39EK20462Fig. 18 - DHS Pressure Limit Location Fig. 19 - DHS Limit Switch P/NStep 4 - Make Piping Connections a50-825350BVT,V,W Units Table 5A - Condenser Pressure Drop50BVC,J,Q Units Table 5B - Condenser Pressure Drop50BVT,U,V,W,X Units Table 6A - Hot Water Pressure Drop50BVC,E,J,K,Q Units Table 6B - Hot Water Pressure Dropa50-7270ef Step 5 - Complete Electrical ConnectionsTable 7B - Economizer Pressure Drop Curve ft wg, 50BVT,U,V,W,X UnitsTable 9A - Electrical Data - 50BVC,E,J,K,Q Table 9B - Electrical Data - 50BVT,U,V,W,X Fig. 24 - Typical Wiring 18 to 30 Ton Units a50-7272efTwo-StageCooling Units Fig. 26 - Field Terminal Block a50-7273efTable 10 - Recommended Cables a50-7164tfa39-1867t Installation Unit Discharge Locationa50-7275ef Fig. 27 - Modular Unit VAV Control Panel10 Kilo- ohm START-UPTable 11 - Thermistor Resistance vs Temperature Values for Supply-AirTemperature SensorTable 13 - Fan Performance - 50BVC,E,Q020 CV Unit Start-UpTable 14 - Fan Performance - 50BVC,E,Q024 Table 15 - Fan Performance - 50BVC,E,Q028 Table 16 - Fan Performance - 50BVC,E,Q034 Table 17 - Fan Performance - 50BVT,U,V034 Table 17 - Fan Performance - 50BVT,U,V034 cont Table 18 - Fan Performance - 50BVT,U,V044 Table 19 - Fan Performance - 50BVT,U,V054 Table 19 - Fan Performance - 50BVT,U,V054 cont Table 20 - Fan Performance - 50BVT,U,V064 Table 20 - Fan Performance - 50BVT,U,V064 cont VAV Unit Start-Up a50-7425ef OMNIZONE VPAC02-06-04 Fig. 32 - LIDFig. 33 - 50BV VFD Display The LID display will show Year Table 21 - Controller Set Points Table 22 - Controller Hardware PointsTable 23 - Software Points Table 24 - Configuration Parameters Unoccupied space or return air temperature demand MAINTENANCE SERVICEFig. 35 - Forced Circulation Method a50-186tfFig. 34 - Gravity Flow Method a50-187tfa50-7135tf Evaporator Fan Performance AdjustmentTROUBLESHOOTING Charging the SystemPOSSIBLE CAUSE PROBLEMPOSSIBLE CAUSE Table 28 - Unit TroubleshootingPROBLEM CORRECTION PROCEDURETable 29 - CV Units LED Diagnostic Codes Table 30 - Forcing an Input or OutputTable 31 - Clearing a Forced Input or Output Page Page Page Page UNIT WIRING FIELD WIRINGPage TRANS-1 FIELD WIRINGWIRE LEGEND a50-7282efPCB2 J1 FIELD WIRINGFIELD WIRING UNIT WIRINGPCB1 PCB1 FIELD WIRINGLEGEND AND NOTES FOR FIG 10-08 Copyright 2008 Carrier CorporationCatalog No Form 50BV-3SICONTROLS START-UPCHECKLISTI. PRELIMINARY INFORMATION II. PRE-START-UPIII.START-UP