III.START-UP:
CHECK FAN SPEED AND RECORD.
AFTER AT LEAST 15 MINUTES RUNNING TIME, RECORD THE FOLLOWING MEASUREMENTS:
CIRCUIT 1 | CIRCUIT 2 | CIRCUIT 3 | CIRCUIT 4 |
SUCTION PRESSURE
SATURATED SUCTION TEMP
SUCTION LINE TEMP
SUPERHEAT DEGREES
DISCHARGE PRESSURE
SATURATED CONDENSING
LIQUID LINE TEMP
SUBCOOLING DEGREES
LIQUID SIGHT GLASS (CLEAR/BUBBLES)
ENTERING
LEAVING
EVAP
EVAP
EVAP
EVAP
COMPRESSOR AMPS:
L1
L2
L3
SUPPLY FAN AMPS:
L1
L2
L3
NOTES: _______________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
Copyright 2008 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. | Printed in U.S.A. | Form | Pg | Replaces: |
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -