Dulcodes | Features of the S2Ca metering pumps |
|
|
IMPORTANT
¥The universal signal cable, the external/contact cable and the level monitor cable should not be less than 1.20 m long, otherwise cable recognition will fail.
5.4Retrofitting relays
(not in PROFIBUS® version)
Delivery range:
1relay circuit set with 2 screw fasteners
1relay cable set with socket
1seal
WARNING
Disconnect the S3Ca from the mains power supply and rinse liquid end before commencing work (see section 10)!
IMPORTANT
When preparing the opening, ensure that the punch is not forced through the entire pump base!
Pump circuits may become damaged.
Place the S2Ca on a firm surface with the relay opening
Place a punch (dia.
If necessary clean up the edges of the opening
Remove the pressed out section from the S2Ca
Inserting the relay component Hold the relay component with your right hand gripping the left and right hand edges of the relay cover, and tilt the front end slightly to the left (see fig. 16)
Push the relay component through the relay opening, holding the upper corner of the lower edge against the guide rail on the pump base, until the contact of the relay component has reached the controller contact. (test: can you still move the end of the circuit back and forth?)
Gently push the relay component right into the opening
Screw the relay cover firmly onto the housing using the screws provided
Insert the relay cable plug seal into the relay cover and screw on the plug (see fig. 18)
The pump is generally programmed
Fig. 15 | Fig. 16 |
ProMinent® | Page 41 |