Thermo Products OL6RA072D48(B/R), OL6FA072DV5(B/R), OL6FA072D48(B/R) Customer, Heating, System

Page 67
CUSTOMER

COMBUSTION AND EFFICIENCY TESTING FOR THERMO PRIDE OIL FIRED CENTRAL FURNACES.

Complete this form for each Thermo Pride furnace installed. Read instruction manual carefully before making tests. Retain this form with furnace.

CUSTOMER

 

NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

BURNER MODEL NO.

BLAST TUBE LGTH.

AIR SHUTTER OPENING

 

 

 

 

 

 

 

 

 

 

 

 

 

INS.

 

 

 

 

 

% OF MAX. (EST)

SYSTEM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION CHAMBER

CONDITION

 

MATERIAL

 

FURNACE MODEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE OF VENTING SYSTEM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MASONRY

 

 

 

METAL

 

 

 

 

 

SIDEWALL

 

 

MASONRY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHIMNEY

 

 

 

CHIMNEY

 

 

 

 

POWER VENTER

 

 

CHIMNEY

 

 

 

 

 

 

 

 

 

 

 

 

METAL

 

 

 

MASONRY CHIMNEY

 

 

 

 

 

 

W/INDUCER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHIMNEY

 

 

 

W/METAL LINER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W/INDUCER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FUEL LINE FILTER

 

DRAFT CONTROL

 

 

 

FURNACE SERIAL NUMBER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION

 

 

 

 

 

 

 

INITIAL

 

SERVICE

SERVICE

SERVICE

 

 

 

 

 

 

 

INSTALLATION

 

TESTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Operate burner

 

CO2 in stack pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at least 10

 

Draft Over-fire

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

minutes before

 

Draft in stack pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

starting tests.)

 

Smoke number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gross stack temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Furnace room temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net stack temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Gross stack minus

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

furnace room temp.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Efficiency

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nozzle size and spray

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oil pump pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operation of Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burner Safety Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check for oil leaks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tests taken by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLER NAME & ADDRESS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

64

Image 67
Contents OL6RX072DV5R OL6RA072D48B/ROL6FA072D48B/R OL6RA072DV5B/RCONTENTS Fuel ConfigurationFeature Model Number Digit1.Excess oil has accumulated I. SAFETY SECTIONcWARNING AND CAUTIONS cCAUTION DO NOT ATTEMPT TO START THE BURNER WHENPage a. Combustible material A. CODES AND CLEARANCESb. Non-combustiblematerial MODEL NO A. CHIMNEYTYPE OF FROM2. PREVENTION OF CHIMNEY CONDENSING 1. PROPER CHIMNEY SIZE3. PROPER CHIMNEY HEIGHT 4. PROPER VENT CONNECTOR PIPE/CHIMNEY CONNECTION9 FLUE PIPE CLEARANCES, SIZING AND TYPE 7. TIGHT CLEAN-OUTDOORS AND CONNECTIONS6. TIGHT JOINTS 8. NO INTERCONNECTED CHIMNEY FLUESB. VENTING C. DRAFT REGULATORS ROTATION OF FRONT FLUE ELBOWNote Do not use with Direct Vent application Airflow Requirements and Sizing of Duct Work D. DUCT WORK/AIR CONDITIONINGPage The ASHRAE Handbook - Fundamentalsis an excellent source of duct system design principles and pressure drop data. Conversely, for a specified type of fitting, it is also possible to determine the required size or diameter of the component for a specified pressure drop and flow rate 1.1 X TR TEMPERATURE RISE, F = HEATINGCFM 1.HEATING CFM HEAT OUTPUT OF FURNACE BTUHFilter Type E. Air Filters Mounted Internal to FurnaceMaximum Model NumberF. LIMIT POSITION AND LOCATION DO NOT CHANGE POSITION OF THE CHAMBER G. BURNER INSTALLATIONNOZZLE SIZE H. BURNER SPECIFICATIONS AND APPLICATIONSOIL NOZZLE CAPACITY CHART + INSULATOR S = SLEEVE OR N = NONENOZZLE SIZE 2 STAGE FIRING RATESCAPACITY FIRINGI. OIL TANK AND PIPING MOUNTING THE 2-STAGERIELLO BURNER5.A readily accessible, design-certified,manual oil shutoff valve, with a non-displaceablerotor member, shall be installed in the fuel oil supply piping within 6 feet of the appliance Maximum J. OIL FILTERK. ELECTRICAL WIRIING AssemblyWire size selections in Table 10 are based upon Table 310-16of the National Electrical Codefor three copper conductors, with insulation rated for 75 degrees Celsius, contained in raceway at 30 degrees Celsius. For other wire insulation temperature ratings and ambient conditions, refer to the National Electrical Codefor the minimum wire sizing requirements Thermostat Anticipator Setting Preferred method of adjustment L. Blower Motor Speed Selection Draw Amps/ / Watts vs Heating Speed Set-upsOL6*A072DV5 Furnace Motor CurrentHeating Speed Set-ups 2 - Stage OL6*X072DV5 LOW CAPACITYHIGH CAPACITY = Recommended heating speed settingExternal Static Pressure in W.C Cooling Speed Set-ups OL6**072DV5Furnace Motor Current Draw Amps / Watts vsPage TERMINAL DEFINITIONS & FIELD WIRING M. BLOWER CONTROLLER INFORMATION FOR PSC MOTORB. Outputs A. InputsC. Operating Modes Heat Mode DIAGNOSTIC FEATURES PSC TROUBLE SHOOTINGi.STOP! Read the safety information above N. STARTUP PROCEDURESOperating Instructions For Your Safety Read Before OperatingTo Turn Off Oil to Appliance 2. Adjustment of Burner CombustionCOMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER TURN TO THE RIGHT SIGN + AIR DAMPER ADJUSTMENTTURN TO THE LEFT SIGN 2nd STAGE ADJUSTMENT 1st STAGE ADJUSTMENTNotice Minimum return air temperature is 55F 3. Adjustment Of Heat Input Rate4. Setting Supply Air Temperature Rise 5. Checkout Procedure cCAUTION DO NOT ATTEMPT TO START THE BURNER WHEN III. USERS INFORMATION SECTIONC. INSPECTION AREAS cCAUTION DO NOT ATTEMPT TO MAKE REPAIRS YOURSELFD. STARTING THE BURNER E. FILTER CLEANING AND LOCATIONIV. INSTALLERS INSTRUCTIONS TO USER A.GENERAL INSPECTION V. DEALER MAINTENANCESAFETY DURING SERVICING AND INSPECTION B. HEAT EXCHANGER C. HEAT EXCHANGER CLEANING INSTRUCTIONSVacuum Hose Length OL6 8FT Figure 24 Heat Exchanger Clean-OutsF. SUPPLY/RETURN AIR FILTER Filter maintenance procedureD. ELECTRICAL SYSTEM E. SUPPLY/RETURN AIR BLOWERG. EXTENDED APPLIANCE SHUTDOWN Filter replacementON STARTUP 2.Remove the furnace front door Riello Burner Beckett BurnerPERSONNEL, AND NOT BY THE FURNACE OWNER VII. TROUBLESHOOTINGA. DIAGNOSTICS Diagnostic FeaturesB. CAD CELL CHECKOUT PROCEDURE VIII. Sequence of Operations Flow Chart Page IX. Trouble Shooting Flow Chart Page Page Page Page HEATING CUSTOMERSYSTEM Replacement Parts for OL6F*072D Appendix - A Replacement PartsPage Replacement Parts for OL6R*072D Page OL6*A072D48 PSC Wiring Diagram Appendix - B Wiring DiagramsOL6*A072DV5 ECM Wiring Diagram OL6*X072DV5 ECM 2-StageWiring Diagram