CAUTION

Install the indoor unit away from any interfering sources such as radio, computer, stereo equipment and also select the place where the electrical wiring work can be possible.

––Especially keep the unit at least 3m away from the electrical equipment in an area electromagnetic waves generated and install the protection tube to protect the main power cable and communication cable.

––Make sure that there is no equipment electromagnetic waves generate. If not, malfunction of the control system may occur due to the effect of the electromagnetic wave. (For example: The remote control sensor of the indoor unit may not be received well of electronic lighting style fluorescent lamps, such as fluorescent lamps are in the same space when using a remote control.)

Make sure to install the outdoor unit in a safe place where snowfall will not be obstructed. The frame should be installed in a place where the air inlet and heat exchanger of the unit are not buried in the snow.

A ventilation system may be required in the case the outdoor unit is installed in a closed space or room, even though R410a is not poisonous or flammable.

Install the railing around the outdoor unit to prevent falling when the unit is installed at high place of roof on the building.

Avoid installing the units in places such as an exhaust pipe and ventilating opening exposed to corrosive gas, oxides of sulfur, ammonia gas or sulfur gas herbicides. (These places need additional anticorrosive treatments. Please contact manufacture to avoid corroding copper pipes or soldered parts)

Depending on the condition of power supply, unstable power or voltage may cause malfunction of the parts or control system. (At the ship or places using power supply from electric generator...etc)

Space requirements

The space suggested below is based on operating condition of outdoor temperature of 35°C. If operating condition of outdoor temperature is higher than 35°C, try to have more space.

Make sure to clear a passage for a person and air flow.

Observe the clearances and dimensions as seen below when installing the outdoor unit.

If you install several outdoor units at the same place, observe the space for ventilation and free airflow.

If the space for ventilation is insufficient, the air conditioner may not generate performance designed. Keep in mind that SAMSUNG logo is located on the front side of outdoor unit.

INSTALLATION PARTS

English 37

Image 37
Contents Air conditioner Contents Safety precautions For Installation Using Parts For Power Supply Using Parts Safety precautions Using Parts For Cleaning Checking the auxiliary power switch Using outdoor unitOperational temperature and humidity range Checking before useMain parts Viewing the partsTo open the panel Control panel and the display Locking the control panelUsing the air conditioner with the control panel Remote controller button Checking the remote controllerInserting the batteries Remote controller displayStoring the remote controller Battery changing timeCool Basic operationAuto DryAdjusting the air flow direction Using the Turbo function Setting the On timer Timer functionSetting the Off timer Cleaning the indoor unit Cleaning and maintaining the air conditionerCleaning the outdoor unit heat exchanger Cleaning the air filter Maintaining the air conditioner Periodical checks Problem Solution TroubleshootingTroubleshooting General information Power supply line, fuse or circuit breaker Installing the unitInstallation Parts Accessory parts list Indoor  outdoor unit type and combination Preparation for installationMoving the outdoor unit Indoor unit Deciding on where to install the productOutdoor unit Deciding on where to install the product Space requirements Installation location 2000 Or more 300 or More 1500 or Or 600 or more more Or more Less than 30m Pipe length between the indoor and the outdoor unitDrilling a hole in the wall Installing Outdoor unit Installing indoor unitBase ground contruction Installation Parts Installation Parts Refrigerant piping work Connecting the pipesFix the pipe on Indoor Selecting refrigerant pipe Pipe connectionTemper grade and minimum thickness of the refrigerant pipe Storing refrigerant pipe Cutting or flaring the pipes Direction of the pipe when brazingTightening flare connection part Pipe bending Connecting the drain hoseInsulating refrigerant pipe Selecting the insulator of the refrigerant pipeAllowable refrigerant pipe length Refrigerant chargingHow to add refrigerant Electrical work Wiring workPower supply and wire specification Phase 4 wires Power wiring diagramEarth Connecting power and communication cableSelecting solderless ring terminal Connecting the power terminal Connect the ring terminal Fixing the power cableGrounding work Installing grounding wire Wiring work Gas leak test and vacuum drying Check lists after completing the installation Testing operations SEG2 SEG3 SEG4 On on Check electrical connection and setting E441 IPM Installationparts How to connect your extended power cables Installation Parts Packing and unpacking guide Packing the indoor unit Unpacking the indoor unitPacking the outdoor unit Unpacking the outdoor unitCooling Questions or COMMENTS?