Check lists after completing the installation

After completing the installation, you must check the following.

 

 

• Have you checked the external surface and the internal part of the

 

 

indoor unit?

 

Indoor

• Is the place well-ventilated and ensures space for service?

 

unit

• Have you checked if the center of the indoor unit is ensured and it is

 

 

installed horizontally in level?

Installation

 

• Have you connected refrigeration pipes properly?

 

• Have you checked the external surface and the internal part of the

 

 

 

 

outdoor unit?

 

Outdoor

• Is there any possibility of short circuit due to the heat of an outdoor

 

unit

unit?

 

 

• Is the place well-ventilated and ensures space for service?

 

 

• Is the outdoor unit fixed securely?

 

 

• Have you checked for any gas leakage?

 

 

• Are the length and the height difference between the refrigerant pipes

Refrigerant pipe

within the allowable range?

• Have you properly insulated pipes?

work

• Is the quantity of the additional refrigerant correctly weighed in?

 

 

 

 

• You must record the amount of additional refrigerant charging on the

 

 

service record label placed outside the outdoor unit.

Installing the

• Have you completed the drain test?

drain pipe

• Is the drainpipe properly insulated?

 

 

 

 

 

• Have you checked for interference between the power and the

 

 

communication cable?

Wiring work

• Have you performed the earthing work 3 to the outdoor unit?

• Is the length of the wire within allowable range?

 

 

 

 

• Is the wiring route correct?

 

 

• Have you used verified power supply cable and the communication cable?

Option

• Check whether the vibration-resistance frame is correctly installed if

there is a possible vibration of the outdoor unit.

 

 

66English

Image 66
Contents Air conditioner Contents Safety precautions For Installation Using Parts For Power Supply Using Parts Safety precautions Using Parts For Cleaning Operational temperature and humidity range Using outdoor unitChecking the auxiliary power switch Checking before useViewing the parts Main partsTo open the panel Locking the control panel Control panel and the displayUsing the air conditioner with the control panel Checking the remote controller Remote controller buttonRemote controller display Inserting the batteriesBattery changing time Storing the remote controllerAuto Basic operationCool DryAdjusting the air flow direction Using the Turbo function Timer function Setting the On timerSetting the Off timer Cleaning and maintaining the air conditioner Cleaning the indoor unitCleaning the outdoor unit heat exchanger Cleaning the air filter Maintaining the air conditioner Periodical checks Troubleshooting Problem SolutionTroubleshooting General information Installing the unit Power supply line, fuse or circuit breakerInstallation Parts Accessory parts list Preparation for installation Indoor  outdoor unit type and combinationMoving the outdoor unit Deciding on where to install the product Indoor unitOutdoor unit Deciding on where to install the product Space requirements Installation location 2000 Or more 300 or More 1500 or Or 600 or more more Or more Pipe length between the indoor and the outdoor unit Less than 30mDrilling a hole in the wall Installing indoor unit Installing Outdoor unitBase ground contruction Installation Parts Installation Parts Connecting the pipes Refrigerant piping workFix the pipe on Indoor Pipe connection Selecting refrigerant pipeTemper grade and minimum thickness of the refrigerant pipe Storing refrigerant pipe Direction of the pipe when brazing Cutting or flaring the pipesTightening flare connection part Connecting the drain hose Pipe bendingSelecting the insulator of the refrigerant pipe Insulating refrigerant pipeRefrigerant charging Allowable refrigerant pipe lengthHow to add refrigerant Wiring work Electrical workPower supply and wire specification Power wiring diagram Phase 4 wiresConnecting power and communication cable EarthSelecting solderless ring terminal Connecting the power terminal Fixing the power cable Connect the ring terminalGrounding work Installing grounding wire Wiring work Gas leak test and vacuum drying Check lists after completing the installation Testing operations SEG2 SEG3 SEG4 On on Check electrical connection and setting E441 IPM Installationparts How to connect your extended power cables Installation Parts Packing and unpacking guide Unpacking the indoor unit Packing the indoor unitUnpacking the outdoor unit Packing the outdoor unitCooling Questions or COMMENTS?